flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

HMC Architects: In their own voices

HMC Architects: In their own voices

See what HMC professionals say about their “Best AEC Firm to Work For”


By By BD+C Staff | January 11, 2013
This article first appeared in the October 2012 issue of BD+C.

HMC Pre-K–12 Schools Practice

Alex Parslow and John Nichols
www.BDCnetwork.com/HMC/Schools

HMC Higher Education Practice

Kate Diamond and Nicole Kerr
www.BDCnetwork.com/HMC/HigherEd

HMC Designing Futures Foundation

Adrienne Luce and Scott Plante
www.BDCnetwork.com/HMC/DFF

HMC Healthcare Practice

Jerry Eich and Trisha Clark
www.BDCnetwork.com/HMC/Healthcare

 

HMC Civic/Justice Practice

Beverly Prior and Kate Diamond
www.BDCnetwork.com/HMC/Civic

HMC ArchLab: Pablo La Roche

www.BDCnetwork.com/HMC/archlab

HMC Career Development Program

Pasqual Gutierrez
www.BDCnetwork.com/HMC/Careers

HMC Mentoring Program

Eera Babtiwale, Israel Peña, Matt Endsley, and Stephen Douglas
www.BDCnetwork.com/HMC/Mentoring

HMC Xref Travel Fellowships: Kaysha Bucher

www.BDCnetwork.com/HMC/Xref

HMC Design Excellence Initiative

Charles Dilworth
www.BDCnetwork.com/HMC/Design

HMC in San Francisco: Cheryl Lentini

www.BDCnetwork.com/HMC/SF

HMC Strategic Plan: Randy Peterson

www.BDCnetwork.com/HMC/Strategy

Related Stories

| Oct 5, 2011

GREENBUILD 2011: Brick offers growing options for sustainable building design

Brick exteriors, interiors and landscaping options can increase sustainability that also helps earn LEED certification.

| Oct 5, 2011

GREENBUILD 2011: Roof hatch designed for energy efficiency

The cover features a specially designed EPDM finger-type gasket that ensures a positive seal with the curb to reduce air permeability and ensure energy performance. 

| Oct 4, 2011

GREENBUILD 2011

Click here for the latest news and products from Greenbuild 2011, Oct. 4-7, in Toronto.

| Oct 4, 2011

GREENBUILD 2011: Methods, impacts, and opportunities in the concrete building life cycle

Researchers at the Massachusetts Institute of Technology’s (MIT) Concrete Sustainability Hub conducted a life-cycle assessment (LCA) study to evaluate and improve the environmental impact and study how the “dual use” aspect of concrete.

| Oct 4, 2011

GREENBUILD 2011: Johnsonite features sustainable products

Products include rubber flooring tiles, treads, wall bases, and more. 

| Oct 4, 2011

GREENBUILD 2011: Nearly seamless highly insulated glass curtain-wall system introduced

Low insulation value reflects value of entire curtain-wall system. 

| Oct 4, 2011

GREENBUILD 2011: Ready-to-use wood primer unveiled

Maintains strong UV protection, clarity even with application of lighter, natural wood tones.

| Oct 4, 2011

GREENBUILD 2011: Two new recycled glass products announced

The two collections offer both larger and smaller particulates. 

| Oct 4, 2011

GREENBUILD 2011: Mythic Paint launches two new paint products

A high performance paint, and a combination paint and primer now available. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021