HOK has appointed Eli Hoisington, AIA, LEED AP, and Susan Klumpp Williams, AIA, LEED AP, as its new co-chief executive officers, succeeding Bill Hellmuth, FAIA, LEED AP, who passed away on April 6, shortly after his scheduled retirement.
Hoisington and Klumpp Williams, who have served as interim co-CEOs since Hellmuth went on medical leave in May 2022, bring a fresh yet familiar perspective to HOK’s leadership. They have previously led two of the firm’s largest offices and are longstanding executive committee members.
Hoisington, the design principal in St. Louis, and Klumpp Williams, the managing principal in Washington, D.C., have collaborated closely with Hellmuth in the past. They will work with HOK’s board to steer the firm’s design vision, business strategy and operations.
Hellmuth’s legacy spans 32 years with HOK, having served as CEO since 2016 and chairman since 2017. His tenure saw HOK win hundreds of design awards, strengthen its commitment to sustainable and regenerative design, open three new offices, diversify its leadership, and increase its pro-bono work and charitable giving. Under Hellmuth’s guidance, HOK earned recognition as one of Time Magazine’s most influential companies and consistently ranked among the world’s largest and greenest architecture/engineering firms.
Hoisington, 46, and Klumpp Williams, now in her 38th year with the firm, break new ground as the youngest and first woman CEOs in HOK’s 68-year history. They bring complementary skill sets and extensive experience to their new roles.
HOK President Carl Galioto, FAIA, LEED AP, praised the new co-CEOs, stating, “Combining Eli’s design expertise and Susan’s business acumen in this new co-CEO leadership structure will drive HOK’s evolution as a more diverse, collaborative and international design firm.”
Hoisington expressed his commitment to enhancing HOK’s global presence as a preeminent, interdisciplinary design firm while building on Hellmuth’s legacy: “Design remains our core focus, shaping everything from project opportunities and business organization to innovation, research, education, mentorship and community engagement. Above all, we will continue using design to improve lives, heal the planet and contribute to the success of our clients.”
Klumpp Williams shared her experience working with Hellmuth: “Having collaborated with Bill in D.C. for 32 years, I understand how he maintained our founders’ vision for a diverse, design-focused practice. Eli and I will work in a similar manner, with him concentrating on design and me continuing my focus on operations.”
As the first woman CEO in HOK’s history, Klumpp Williams acknowledged the significance of her role: “This is an opportunity to underscore the power of diverse leadership. It also demonstrates HOK’s dedication to fostering diversity and inclusion across the firm. I’m eager to contribute to this ongoing transformation and further HOK’s commitment to ensuring that all our staff have equitable experiences in their career growth.”
Related Stories
| Oct 13, 2010
Editorial
The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.
| Oct 13, 2010
Test run on the HP Z200 SFF Good Value in a Small Package
Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 13, 2010
Thought Leader
Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.
| Oct 13, 2010
Hospital tower gets modern makeover
The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.
| Oct 13, 2010
Modern office design accentuates skyline views
Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.
| Oct 13, 2010
Hospital and clinic join for better patient care
Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and outpatient care.
| Oct 13, 2010
Biloxi’s convention center bigger, better after Katrina
The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.
| Oct 13, 2010
Tower commemorates Lewis & Clark’s historic expedition
The $4.8 million Lewis and Clark Confluence Tower in Hartford, Ill., commemorates explorers Meriwether Lewis and William Clark at the point where their trek to the Pacific Ocean began—the confluence of the Mississippi and Missouri Rivers.
| Oct 13, 2010
Maryland replacement hospital expands care, changes name
The new $120 million Meritus Regional Medical Center in Hagerstown, Md., has 267 beds, 17 operating rooms with high-resolution video screens, a special care level II nursery, and an emergency room with 53 treatment rooms, two trauma rooms, and two cardiac rooms.