flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

HOK offers guidance for reducing operational and embodied carbon in labs

Codes and Standards

HOK offers guidance for reducing operational and embodied carbon in labs

Pathway to Net Zero Carbon Labs report released,


By Peter Fabris, Contributing Editor | March 10, 2022
Reducing Carbon
Courtesy Pixabay.

Global design firm HOK has released research providing lab owners and developers guidance for reducing operational and embodied carbon to meet net zero goals.
 
HOK’s initial analysis indicates that it is possible to build and operate labs in accordance with the sustainable design goals of the RIBA and AIA 2030 challenges, according to the report’s executive summary. “The approaches studied in this analysis can significantly reduce the whole-life carbon (operational carbon + embodied carbon × building lifespan) of a lab building,” the document says.
 
Modelling revealed little difference between vertical and linear lab building forms in achieving net zero. But linear labs’ expansive roofs provide an advantage by allowing for more solar panel arrays.
 
The analysis examined new lab buildings, but the most sustainable option is to reuse and adapt existing buildings, HOK says. Lab buildings are significantly more energy intensive to operate than commercial office buildings and their embodied carbon also is much higher than typical commercial space. Labs demand far greater ventilation than most building types and are home to highly energy-intensive equipment that is often in operation 24 hours a day. Labs also require robust structural systems to limit building vibration and support heavy building loads.
 
HOK’s analysis looked at numerous strategies to reduce carbon footprint in lab structures. The report provides technical details on these approaches.

Related Stories

Adaptive Reuse | Oct 26, 2020

Mall property redevelopments could result in dramatic property value drops

Retail conversions to fulfillment centers, apartments, schools, or medical offices could cut values 60% to 90%.

Codes and Standards | Oct 26, 2020

New seismic provisions for the National Earthquake Hazards Reduction Program released

The provisions present a set of recommended improvements to the ASCE/SEI 7-16 Standard.

Codes and Standards | Oct 22, 2020

More than 130 building projects have engaged LEED’s Safety First Credits in response to COVID-19

Best practices helping companies develop and measure healthy, sustainable, and resilient reopening efforts.

Codes and Standards | Oct 21, 2020

New technologies and techniques can ‘future-proof’ buildings

Net-zero principles may give buildings longer lives.

Codes and Standards | Oct 20, 2020

Updated AIA Contractor’s Qualification Statement and Warranty Bond documents available

Statement now includes safety protocols and plans, sustainability, and BIM experience.

Codes and Standards | Oct 19, 2020

NEXT Coalition chooses five pilot projects to fight COVID-19 on jobsites

Mobile platforms, wearable sensors, AI video systems among the trial solutions.

Codes and Standards | Oct 15, 2020

Neighborhoods Now offers cost-effective, DIY designs in response to COVID-19 pandemic

Designs include barriers for outdoor dining, sidewalk retail displays, and modular seating for public spaces.

Codes and Standards | Oct 14, 2020

Standard contract document for prefab and modular building released

ConsensusDocs addresses the most common prefabricated construction use-case scenario.

Codes and Standards | Oct 13, 2020

Austin is first major Texas city to adopt wildfire code

New ordinance based on the International Wildland-Urban Interface Code.

Codes and Standards | Oct 12, 2020

Guidance offered for K-12 schools to support students with asthma

Green purchasing policies for cleaning, filters, furniture and other products encouraged.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021