flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Hotel construction pipeline reaches six-year high

Hotel Facilities

Hotel construction pipeline reaches six-year high

After a three-year bottoming formation, the pipeline for hotel construction has posted five consecutive quarters of double-digit year-over-year growth.


By Lodging Econometrics | March 4, 2015
Hotel construction pipeline reaches six-year high

The number of units under construction is up 37% by projects and 34% by rooms, according to Lodging Econometrics. Photo: Abdul-Jawad Elhusuni via Wikimedia Commons

Lodging Econometrics reports that with 3,645 projects (totaling 460,551 rooms), the 2014 total U.S. lodging construction pipeline stands at its highest level in six years.

After a three-year bottoming formation, the pipeline has now posted five consecutive quarters of double-digit year-over-year (YOY) growth. In both the third and fourth quarters, increases were particularly impressive, exceeding 20%.

Although the breakout might appear robust, pipeline totals are still a long way from the peak of 5,438 projects/718,387 rooms set in 2007.

Projects under construction, the most important predictor of near-term supply growth, has catapulted forward to 1,086 projects/136,442 rooms—the highest level in more than five years. The number of units under construction is up 37% by projects and 34% by rooms (YOY).

 

 

Projects scheduled to start construction in the next 12 months have risen strongly, to 1,351 projects/160,061 rooms, up 17% and 13% YOY, respectively.

The growing number of projects in early planning is only just beginning. The cyclical bottom for projects in early planning just occurred in the second quarter of 2014. It bounced back smartly in the second half of the year, adding 221 projects, and ended 2014 at 1,208 projects/164,048 rooms.

Projects in early planning directly influence the number of hotels that will open three to five years outward. Projects that enter the pipeline in early planning are generally larger hotels in downtown or resort locations. Most are upscale select-service projects, while others are upper upscale and luxury full-service hotels that are frequently part of mixed-use developments.

Planning and permitting these larger, more complex projects is typically more protracted and also comes with longer construction periods. These projects generally open near the end of a real estate cycle, often times after the cycle has already peaked and begun to decline. 

Project counts in early planning are expected to spurt forward over the next two to three years and make significant additions to new supply towards the end of the decade.

Related Stories

Hotel Facilities | Nov 29, 2018

Disney’s new 15-story tower at Coronado Springs to open in July 2019

Reservations for Gran Destino Tower began on Nov. 27.

Hotel Facilities | Aug 10, 2018

How hospitality design makes spaces of all types better for users

Responding to these shifting expectations, building owners and design teams working in other markets now regularly embrace leading ideas from the world of hospitality and infuse them into their projects.

Hotel Facilities | Aug 1, 2018

'Home away from home' is hoteliers' newest theme

Creating an experience, with the accent on local color, is flavoring hotel design.

Sponsored | Hotel Facilities | Jul 13, 2018

Hotel renovation: More than just minding the dust

Do you know the vital signs for avoiding moisture & mold problems? Will your brand standards cause you headaches? How will you recover costs if you do get into trouble?

Hotel Facilities | May 4, 2018

Retro hotel is inspired by Spaghetti Westerns

There’s two types of people in this world: those who like The Good, The Bad, and The Ugly, and those who are wrong.

Hotel Facilities | Apr 27, 2018

Hotel Zachary opens next to Chicago’s Wrigley Field

Stantec Architecture and Studio K Creative designed the project.

Hotel Facilities | Apr 25, 2018

15-story Cambria Hotel opens in Philadelphia

DAS Architects designed the project.

Hotel Facilities | Apr 13, 2018

BIG’s Audemars Piguet hotel des Horlogers allows guests to ski down the roof

The 75,000-sf hotel is currently under construction.

Hotel Facilities | Apr 3, 2018

Downtown Seattle receives new flagship Embassy Suites in Pioneer Square

The hotel brings 282 suites to Seattle’s oldest neighborhood.

boombox1
boombox2
native1

More In Category

3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021