flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Hotel construction pipeline reaches six-year high

Hotel Facilities

Hotel construction pipeline reaches six-year high

After a three-year bottoming formation, the pipeline for hotel construction has posted five consecutive quarters of double-digit year-over-year growth.


By Lodging Econometrics | March 4, 2015
Hotel construction pipeline reaches six-year high

The number of units under construction is up 37% by projects and 34% by rooms, according to Lodging Econometrics. Photo: Abdul-Jawad Elhusuni via Wikimedia Commons

Lodging Econometrics reports that with 3,645 projects (totaling 460,551 rooms), the 2014 total U.S. lodging construction pipeline stands at its highest level in six years.

After a three-year bottoming formation, the pipeline has now posted five consecutive quarters of double-digit year-over-year (YOY) growth. In both the third and fourth quarters, increases were particularly impressive, exceeding 20%.

Although the breakout might appear robust, pipeline totals are still a long way from the peak of 5,438 projects/718,387 rooms set in 2007.

Projects under construction, the most important predictor of near-term supply growth, has catapulted forward to 1,086 projects/136,442 rooms—the highest level in more than five years. The number of units under construction is up 37% by projects and 34% by rooms (YOY).

 

 

Projects scheduled to start construction in the next 12 months have risen strongly, to 1,351 projects/160,061 rooms, up 17% and 13% YOY, respectively.

The growing number of projects in early planning is only just beginning. The cyclical bottom for projects in early planning just occurred in the second quarter of 2014. It bounced back smartly in the second half of the year, adding 221 projects, and ended 2014 at 1,208 projects/164,048 rooms.

Projects in early planning directly influence the number of hotels that will open three to five years outward. Projects that enter the pipeline in early planning are generally larger hotels in downtown or resort locations. Most are upscale select-service projects, while others are upper upscale and luxury full-service hotels that are frequently part of mixed-use developments.

Planning and permitting these larger, more complex projects is typically more protracted and also comes with longer construction periods. These projects generally open near the end of a real estate cycle, often times after the cycle has already peaked and begun to decline. 

Project counts in early planning are expected to spurt forward over the next two to three years and make significant additions to new supply towards the end of the decade.

Related Stories

| Jul 20, 2012

Global boom for hotels; for retail, not so much

The Giants 300 Top 10 Firms in the Hospitality and Retail sectors.

| Jul 17, 2012

KM/Plaza changes name to Plaza Construction

Lands new projects including the Perry South Beach Hotel and Dadeland Mall Kendall Wing Expansion.

| Jun 25, 2012

Living green wall planned for InterContinental Chicago

Project, with price tag of $2 million to $3 million, needs council approval.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| Apr 6, 2012

Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning

The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.

| Apr 3, 2012

Luxury hotel 'groundscraper' planned in abandoned quarry

Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.

| Dec 19, 2011

Chicago’s Aqua Tower wins international design award

Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.

| Dec 2, 2011

What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20

Nominate a colleague, peer, or even yourself. Applications available here.

boombox1
boombox2
native1

More In Category

3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021