flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Hotel project pipeline up 5% in January

Hotel project pipeline up 5% in January

Luxury leads the segment, followed by upscale


By BD+C Staff | February 15, 2013
Luxury and upscale projects lead the increase in hotel construction and planning
Luxury and upscale projects lead the increase in hotel construction and planning.

According to the January 2013 STR Pipeline Report, the total active U.S. hotel development pipeline comprises 2,637 projects totaling 307,289 rooms. 

This represents a 4.9% increase in the number of rooms in the total active pipeline compared with January 2012, and a 38.3% increase in rooms under construction. The total active pipeline data includes projects in the construction, final planning, and planning stages but does not include projects in the pre-planning stage.

"Under construction rooms continue their steady climb, increasing about 7% from last month and more than 38% versus January 2012," said Bobby Bowers, Senior VP of Operations at STR. "Upscale and Upper Midscale brand dominance continues, accounting for almost 63% of rooms that have broken ground. Additionally, Luxury rooms under construction are up significantly from January 2012, perhaps reflecting confidence in the industry's sustained upward momentum. We expect supply growth to continue inching forward in 2013, with full year net growth of around 1%."

Among the Chain Scale segments, the Luxury segment reported the largest increase in rooms in the total active pipeline, rising 96.8% with 7,940 rooms, followed by the Upscale segment with a 10.7% increase to 82,412 rooms. Three markets reported double-digit decreases in the number of rooms in the total active pipeline: Upper Upscale segment (-22.5% with 15,339 rooms); the Midscale segment (-17.9% with 19,530 rooms); and the Economy segment (-11.2% with 4,002 rooms).

(http://www.worldpropertyjournal.com/north-america-vacation-news/us-hotel-development-pipeline-str-pipeline-report-new-hotels-under-construction-bobby-bowers-6527.php)

Related Stories

| Nov 10, 2014

Hotel construction pipeline hits five-year high

The hotel construction pipeline hit a five-year high in the third quarter, clocking in at 3,516 projects and 443,936 rooms, Lodging Econometrics reports. 

| Oct 31, 2014

Dubai plans world’s next tallest towers

Emaar Properties has unveiled plans for a new project containing two towers that will top the charts in height, making them the world’s tallest towers once completed.

| Oct 30, 2014

New hotel to be developed at future Dallas Cowboys World Headquarters

The Omni property will be one of the only full-service upscale hotels in the area, and serve as a cornerstone of the mixed-use development, which will be anchored by the Dallas Cowboys World Headquarters and Frisco’s Multi-Use Event Center.

| Oct 29, 2014

Better guidance for appraising green buildings is steadily emerging

The Appraisal Foundation is striving to improve appraisers’ understanding of green valuation.

| Oct 22, 2014

Must see: Tilted cube concept for mountainside lodge in Slovakia

The tilted-cube design was designed to visually disorient the viewer and create visual lightness in the harsh landscape. In a sense, the concept was intended to evoke a boulder resting on the mountainside. 

| Oct 21, 2014

Norman Foster, Zaha Hadid release plans for resorts in Nanjing and Wuhan, China

Jumeirah Group, a hotel group forming a part of investment group Dubai Holding, has chosen Zaha Hadid and Norman Foster to design two of three of its proposed resorts in Nanjing, Wuhan, and Haikou.

| Oct 16, 2014

Perkins+Will white paper examines alternatives to flame retardant building materials

The white paper includes a list of 193 flame retardants, including 29 discovered in building and household products, 50 found in the indoor environment, and 33 in human blood, milk, and tissues.

| Oct 15, 2014

Harvard launches ‘design-centric’ center for green buildings and cities

The impetus behind Harvard's Center for Green Buildings and Cities is what the design school’s dean, Mohsen Mostafavi, describes as a “rapidly urbanizing global economy,” in which cities are building new structures “on a massive scale.” 

| Oct 15, 2014

Hilton launches boutique hotel chain

The Canopy by Hilton brand will feature the personality of nearby neighborhoods, using locally sourced food and art, and incorporate the latest technologies, like phone-based room keys. 

| Oct 12, 2014

AIA 2030 commitment: Five years on, are we any closer to net-zero?

This year marks the fifth anniversary of the American Institute of Architects’ effort to have architecture firms voluntarily pledge net-zero energy design for all their buildings by 2030. 

boombox1
boombox2
native1

More In Category

3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021