Houston continues to be a paradise for AEC firms. The Texas metroplex has more than 14.4 million sf of office construction in the works, making it the No. 1 market in North America for office building, according to Colliers International’s 2015 North America Office Market report.
This report assesses 92 markets in the U.S. and Canada, and analyzes factors and trends that might impact the office construction market’s health. Despite a slow first quarter, Colliers is forecasting growth for this year.
The top 10 markets in North America, in descending order, are Houston, Seattle/Puget Sound, San Jose, Washington D.C., Dallas, Toronto, Calgary, San Francisco, Boston, and Phoenix. Combined, they accounted for 58% of the 113.8 million sf of office space underway in the U.S. and Canada in the first quarter of this year. That percentage is more than double these markets’ 27% share of existing office inventory.
As of the first quarter, office construction in the United States stood at 95.2 million sf, or 1% off from the same period a year earlier. However, deliveries in the first quarter, at 16 million sf, were the highest they’d been since the third quarter of 2009. Colliers says demand for new space “remains voracious” high-tech oriented markets. On the other hand, the greatest oversupply risk is in energy driven markets.
Colliers still sees the U.S. office market as positioned for expansion this year. “Growth in nearly every subsector of the primary office-using employment sectors in Q1 2015 despite numerous headwinds bodes well for office demand going forward,” it predicts. And outside of a handful of markets, oversupply is not a concern.
Among the 10 largest office construction markets:
• Seattle has 8.29 million sf under construction, the vast majority of which is being built in its downtown area, where existing inventory exceeds 56 million sf.
• In San Jose, all of its 8.1 million sf of new office construction is occurring in the suburbs, which already have 68.4 million sf of existing office space available, but where San Jose’s vacancy rate is only 8%.
• Washington D.C. has an 11.7% urban vacancy rate and a 17.5% suburban vacancy rate. Nevertheless, Washington has nearly 4.4.million sf of office space under construction in its suburbs, and another 2.4 million sf being built in its downtown.
• Only 450,000 sf of the 5.8 million sf of offices under construction in Dallas will be downtown. The same dynamic is occurring in Houston, where only 1.4 million sf of its total office construction is downtown.
Related Stories
| Oct 10, 2013
Carnegie Mellon study looks at impact of dashboards on energy consumption
A recent study by Carnegie Mellon took a look at the impact of providing feedback in an energy dashboard form to workers and studying how it impacted overall energy consumption.
| Oct 9, 2013
SOM gets second crack at iconic modernist structure in New York
More than 50 years after SOM completed the Manufacturers Hanover Trust building, the firm is asked to restore and modernize the space.
| Oct 7, 2013
Nation's first glass curtain wall exterior restored in San Francisco
The Hallidie Building's glass-and-steel skin is generally recognized as the forerunner of today’s curtain wall facilities.
| Oct 7, 2013
10 award-winning metal building projects
The FDNY Fireboat Firehouse in New York and the Cirrus Logic Building in Austin, Texas, are among nine projects named winners of the 2013 Chairman’s Award by the Metal Construction Association for outstanding design and construction.
| Oct 2, 2013
Corporate HQ in 10 months made possible with BIM coordination
An integrated Building Team uses BIM/VDC to convert a 1940s-era industrial building into a flashy new headquarters for Hillshire Brands in a matter of months.
| Oct 1, 2013
13 structural steel buildings that dazzle
The Barclays Center arena in Brooklyn and the NASCAR Hall of Fame in Charlotte, N.C., are among projects named 2013 IDEAS2 winners by the American Institute of Steel Construction.
| Sep 24, 2013
8 grand green roofs (and walls)
A dramatic interior green wall at Drexel University and a massive, 4.4-acre vegetated roof at the Kauffman Performing Arts Center in Kansas City are among the projects honored in the 2013 Green Roof and Wall Awards of Excellence.
| Sep 19, 2013
What we can learn from the world’s greenest buildings
Renowned green building author, Jerry Yudelson, offers five valuable lessons for designers, contractors, and building owners, based on a study of 55 high-performance projects from around the world.
| Sep 19, 2013
6 emerging energy-management glazing technologies
Phase-change materials, electrochromic glass, and building-integrated PVs are among the breakthrough glazing technologies that are taking energy performance to a new level.
| Sep 19, 2013
Roof renovation tips: Making the choice between overlayment and tear-off
When embarking upon a roofing renovation project, one of the first decisions for the Building Team is whether to tear off and replace the existing roof or to overlay the new roof right on top of the old one. Roofing experts offer guidance on making this assessment.