flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Houston's office construction is soaring

Houston's office construction is soaring

Energy companies’ building spree pushes this market to new heights.


By John Caulfield, Senior Editor | October 6, 2014
Photo: Spacecaptain via Wikimedia Commons

Houston has 19 million sf of office space under construction, 54% more than a year ago, and its highest level since the booming 1980s, according to local news reports.

Nearly 40% of this new office space is corporately owned, according to the Houston Business Journal, which points specifically to a 3-million-sf campus being built by Exxon Mobil, a 1.1-million-sf campus in Westchase suburb by Phillips 66, and a 515,000-sf building that Southwestern energy is erecting.

New building begets higher land prices. CBRE research estimates that land values throughout the Houston metroplex are increasing strongly. For example, land prices in the Uptown/Galleria area range from $125 to $315 per square foot in the second quarter, according to the Houston Chronicle.

Construction workers are also benefiting from all of this activity. The Associated General Contractors of America says that Houston added more construction jobs that any major metro in the U.S. from August 2013 to August 2014.  Houston’s employment in all business sectors has jumped by 10% since 2008, or twice the percentage in San Francisco, according to The Daily Beast.

The Business Journal reports that 10.8 million sf of office space are on schedule to be delivered by year’s end, a sizable jump over the 3.2 million sf delivered in 2013.

Related Stories

| Oct 27, 2011

ASSA Abloy, MAXXESS Systems announce U.S. Aperio integration

Aperio will integrate with MAXXESS's eAXxess  and Efusion Event Management Software packages.

| Oct 26, 2011

Metl-Span selected for re-roof project

School remained in session during the renovation and it was important to minimize the disruption as much as possible.

| Oct 26, 2011

Shawmut Design and Construction awarded Tag Heuer build in Aventura, Fla.

New store features 1,200 sf fit out at Aventura Mall.

| Oct 25, 2011

HKS Science & Technology practice formed

Specializing in the planning and design of highly technical building types, HKS’s Science & Technology practice offers the broadest range of services available to the academic and biomedical research, biotechnology, pharmaceutical and medical device community, including laboratory programming, planning and design, strategic science planning and laboratory equipment planning.

| Oct 25, 2011

Universal teams up with Earthbound Corp. to provide streamlined commercial framing solutions

The primary market for the Intact Structural Frame is light commercial buildings that are typically designed with concrete masonry walls, steel joists and steel decks.

| Oct 25, 2011

Ritner Steel CEO elected to AISC Board

Freund will begin serving on the AISC board of directors, assisting with the organization's planning and leadership in the steel construction industry.

| Oct 25, 2011

Commitment to green building practices pays off

The study, conducted by the Pacific Northwest National Laboratory, built on a good indication of the potential for increased productivity and performance pilot research completed two years ago, with similarly impressive results.

| Oct 25, 2011

DOE issues report on financing solar photovoltaic systems for K-12 schools

The report examines the two primary types of ownership models used to obtain solar installations. This analysis can help school administrators across the country select the best option for deploying solar technologies in their school districts.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021