flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Hunt Development Group selected to spearhead Cabrini-Green redevelopment

Mixed-Use

Hunt Development Group selected to spearhead Cabrini-Green redevelopment

The Chicago Housing Authority selected the firm to develop mixed-income housing and retail space where the infamous housing project once stood.


By David Malone, Associate Editor | February 22, 2017

Photo: Wikimedia Creative Commons

The City of Chicago’s attempt at redeveloping the area that was once home to the Cabrini-Green housing project has taken another step forward, as the Chicago Housing Authority has selected Hunt Development Group to develop almost 500 homes in the area.

The El Paso-based firm’s project will include a 21-story tower, 32,900 sf of retail space, and connected mid-rise buildings and low-rise townhomes, Crain’s Chicago Business reports.  A total of 480 mixed-income housing units will be created on a 6.9-acre site at Larrabee Street and Clybourn Avenue.

Units will range from one to four bedrooms and include 183 units for Chicago Housing Authority residents, 82 units at affordable rents, and 217 units at market rates. The surrounding area has seen luxury residential towers and retail projects rise since the housing project was torn down almost six years ago.

Imagine Group and Chicago Neighborhood Initiatives will collaborate with Hunt, who will serve as the Master Developer, on the project. Construction is expected to being in late 2018.

Tags

Related Stories

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 23, 2012

Summit Design+Build selected as GC for Chicago restaurant

Little Goat will truly be a multifunctional space.  Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.

| Apr 30, 2012

HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project

HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.

| Apr 20, 2012

Shawmut completes Yard House Restaurant in Boston

12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.

| Apr 6, 2012

Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning

The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.

| Apr 4, 2012

JCJ Architecture designs New York City's first casino

Aqueduct Racetrack complex transformed into modern entertainment destination.

| Apr 3, 2012

Luxury hotel 'groundscraper' planned in abandoned quarry

Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.

| Mar 16, 2012

Temporary fix to CityCenter's Harmon would cost $2 million, contractor says

By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021