flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

IMEG Corp. acquires Cardno Structural Engineering

Engineers

IMEG Corp. acquires Cardno Structural Engineering

The team joined IMEG on May 29.


By IMEG Corp. | June 4, 2020

IMEG Corp., a leading full-service engineering firm, has acquired the structural engineering group of Cardno.   

Founded in Houston in 1976 as Haynes Whaley, the structural group joined Cardno, a publicly traded global engineering and environmental consulting firm, in October 2013. The team specializes in structural design and forensic engineering in a variety of market sectors. Its offices in Reston, VA, and Houston and Austin, TX, add to the reach of IMEG’s previously existing 50 offices.

"We are excited to add Cardno’s structural team and deepen our bench of expertise," said IMEG President/CEO Paul VanDuyne. “Their strong and diverse client base is a testament to their technical skills and customer-based focus – two vital characteristics that match IMEG’s own priorities.” VanDuyne added that the team’s structural capabilities complement IMEG’s existing MEP capabilities in the Texas region and the Reston office is a great first step in expanding east. “This enables us to now offer full engineering building design services in the Texas marketplace and positions IMEG for future growth,” he said.

Bob Pronier, Principal and team leader, said his team is looking forward to being part of IMEG’s growing national presence and breadth of disciplines. “By combining both firms’ structural building expertise, along with IMEG’s building design experience in multiple national markets, we’re creating a strong synergy for future growth,” he said. “This acquisition also enhances the expertise and value we bring to our clients.” Bob will continue to lead the Reston, Houston, and Austin operations.

The team joined IMEG on May 29 and is now doing business as IMEG Corp. It will continue to operate out of its existing locations with the same team and leadership continuity. AEC Advisors, LLC initiated the transaction and advised Cardno.

Tags

Related Stories

| Jan 19, 2011

New Fort Hood hospital will replace aging medical center

The Army Corps of Engineers selected London-based Balfour Beatty and St. Louis-based McCarthy to provide design-build services for the Fort Hood Replacement Hospital in Texas, a $503 million, 944,000-sf complex partially funded by the American Recovery and Reinvestment Act. The firm plans to use BIM for the project, which will include outpatient clinics, an ambulance garage, a central utility plant, and three parking structures. Texas firms HKS Architects and Wingler & Sharp will participate as design partners. The project seeks LEED Gold.

| Jan 19, 2011

Museum design integrates Greek history and architecture

Construction is under way in Chicago on the National Hellenic Museum, the nation’s first museum devoted to Greek history and culture. RTKL designed the 40,000-sf limestone and glass building to include such historic references as the covered walkway of classical architecture and the natural wood accents of Byzantine monasteries. The museum will include a research library and oral history center, plus a 3,600-sf rooftop terrace featuring three gardens. The project seeks LEED Silver.

| Jan 19, 2011

Large-Scale Concrete Reconstruction Solid Thinking

Driven by both current economic conditions and sustainable building trends, Building Teams are looking more and more to retrofits and reconstruction as the most viable alternative to new construction. In that context, large-scale concrete restoration projects are playing an important role within this growing specialty.

| Jan 10, 2011

Michael J. Alter, president of The Alter Group: ‘There’s a significant pent-up demand for projects’

Michael J. Alter, president of The Alter Group, a national corporate real estate development firm headquartered in Skokie, Ill., on the growth of urban centers, project financing, and what clients are saying about sustainability.

| Jan 7, 2011

BIM on Target

By using BIM for the design of its new San Clemente, Calif., store, big-box retailer Target has been able to model the entire structural steel package, including joists, in 3D, chopping the timeline for shop drawings from as much as 10 weeks down to an ‘unheard of’ three-and-a-half weeks.

| Jan 7, 2011

How Building Teams Choose Roofing Systems

A roofing survey emailed to a representative sample of BD+C’s subscriber list revealed such key findings as: Respondents named metal (56%) and EPDM (50%) as the roofing systems they (or their firms) employed most in projects. Also, new construction and retrofits were fairly evenly split among respondents’ roofing-related projects over the last couple of years.

| Jan 7, 2011

Total construction to rise 5.1% in 2011

Total U.S. construction spending will increase 5.1% in 2011. The gain from the end of 2010 to the end of 2011 will be 10%. The biggest annual gain in 2011 will be 10% for new residential construction, far above the 2-3% gains in all other construction sectors.

| Jan 7, 2011

Mixed-Use on Steroids

Mixed-use development has been one of the few bright spots in real estate in the last few years. Successful mixed-use projects are almost always located in dense urban or suburban areas, usually close to public transportation. It’s a sign of the times that the residential component tends to be rental rather than for-sale.

| Jan 4, 2011

Product of the Week: Zinc cladding helps border crossing blend in with surroundings

Zinc panels provide natural-looking, durable cladding for an administrative building and toll canopies at the newly expanded Queenstown Plaza U.S.-Canada border crossing at the Niagara Gorge. Toronto’s Moriyama & Teshima Architects chose the zinc alloy panels for their ability to blend with the structures’ scenic surroundings, as well as for their low maintenance and sustainable qualities. The structures incorporate 14,000 sf of Rheinzink’s branded Angled Standing Seam and Reveal Panels in graphite gray.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021