Construction employment increased in December 2011 by 17,000, driven by gains in nonresidential construction employment, according the Associated General Contractors of America, Washington, D.C.
AGC officials said that construction employment likely benefited from unseasonably warm weather across much of the country that extended the building season.
“Nonresidential construction is clearly driving [December’s] employment gains,” said Ken Simonson, AGC chief economist. “But it is too early to tell whether those gains came because the weather was good enough for crews to keep working well into December or because demand is truly rebounding.”
Total construction employment now stands at 5,544,000, or 0.3% higher than a month earlier and 46,000 (0.8%) higher than December 2010, Simonson said. He added that the latest employment figures continue a months-long trend of slight gains followed by slight declines in construction employment, and that overall construction employment is still far below its peak level of 7,726,000 in April 2006. Despite the employment increase in December 2011, the industry’s unemployment rose in December to 16%, up from 13.1% in November.
Simonson said nonresidential specialty trade contractors added 20,200 positions, while heavy and civil engineering construction firms that perform the majority of publicly funded construction work shed 300 jobs. Nonresidential building contractors shed 2,700 jobs in December. Residential construction lost 400 total jobs, as the residential specialty trade contractors shed 2,900 jobs and residential builders added only 2,500 positions in December.
Related Stories
| Oct 13, 2010
Editorial
The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.
| Oct 13, 2010
Test run on the HP Z200 SFF Good Value in a Small Package
Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 13, 2010
Thought Leader
Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.
| Oct 13, 2010
Hospital tower gets modern makeover
The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.
| Oct 13, 2010
Modern office design accentuates skyline views
Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.
| Oct 13, 2010
Hospital and clinic join for better patient care
Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and outpatient care.
| Oct 13, 2010
Biloxi’s convention center bigger, better after Katrina
The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.
| Oct 13, 2010
Tower commemorates Lewis & Clark’s historic expedition
The $4.8 million Lewis and Clark Confluence Tower in Hartford, Ill., commemorates explorers Meriwether Lewis and William Clark at the point where their trek to the Pacific Ocean began—the confluence of the Mississippi and Missouri Rivers.
| Oct 13, 2010
Maryland replacement hospital expands care, changes name
The new $120 million Meritus Regional Medical Center in Hagerstown, Md., has 267 beds, 17 operating rooms with high-resolution video screens, a special care level II nursery, and an emergency room with 53 treatment rooms, two trauma rooms, and two cardiac rooms.