flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

International Green Construction Code will include option for outcome-based approach

International Green Construction Code will include option for outcome-based approach

The outcome-based approach requires the building owner to provide the building’s utility bills for a 12-month period within three years. 


By Peter Fabris, Contributing Editor | November 26, 2014
Photo: krishnan via FreeDigitalPhotos.net
Photo: krishnan via FreeDigitalPhotos.net

The 2015 International Green Construction Code (IgCC) will include the option to use an outcome-based approach when complying with local building energy codes, the first time the IgCC has allowed this method.

Previously, building energy codes relied on two main pathways to demonstrate compliance: performance (modeling energy consumption), and prescriptive measures (following code-defined values for individual building components). Both approaches fail to fully account for how buildings use power once they are completed, occupied, and maintained, according to the Institute for Market Transformation (IMT).

The new provision will help communities to ensure energy-efficient buildings are meeting performance expectations. The outcome-based approach requires the building owner to provide the building’s utility bills for a 12-month period within three years. This will ease pressure on code departments and align with the growing number of energy benchmarking regulations across the country, IMT says.

The decision to include an outcome-based pathway in the 2015 IgCC will directly influence future editions of the IgCC and other codes such as the Energy Conservation Code. This should smooth the process of including ASHRAE Standard 189.1 and the LEED green building program into the development of the IgCC, IMT says.

(http://www.imt.org/news/the-current/outcome-based-pathway-is-voted-into-the-2015-igcc)

Related Stories

| Jan 31, 2013

Proposed ASHRAE legionellosis prevention standard open for third public comment

Changes to a proposed ASHRAE legionellosis prevention standard associated with building water systems are open for public comment.

| Jan 31, 2013

More severe wind storms should prompt nationwide reexamination of building codes, says insurance expert

The increased number and severity of storms with high winds nationally should prompt a reexamination of building codes in every community, says Mory Katz, vice president, Verisk Insurance Solutions Commercial Property, Jersey City, N.J.

| Jan 31, 2013

California Building Standards Commission adopts 2013 code update

The California Building Standards Commission adopted the new 2013 state standards code that includes new energy code provisions, accessibility standards, green building and water use modifications.

| Jan 25, 2013

D.C. authority wants to halt sewer tunnel projects while investigating green stormwater alternatives

The District of Columbia Water and Sewer Authority has proposed suspending a tunnel-building project.

| Jan 25, 2013

Energy modeling needed to overcome ‘plug load problem’ to meet high green standards

Plug loads illustrate how much end-users impact overall building energy use.

| Jan 25, 2013

ASHRAE publishes revised filtration standard, combines Standard 52.1 and 52.2

A newly revised filtration standard from ASHRAE combines two standards aimed at improving the technical accuracy of filter testing.

| Jan 25, 2013

AISC 206-13 standard for structural steel erectors available for review

AISC 206-13, a quality management system standard for structural steel erectors, is now available for public review.

| Jan 25, 2013

Builders Hardware Manufacturers Assn. revises five ANSI hardware standards

The Builders Hardware Manufacturers Association (BHMA) has released five revisions to ANSI/BHMA standards recently been approved by ANSI (American National Standards Institute).

| Jan 16, 2013

Pentagon plans huge spending cuts, including construction funds, amid budget deadlock fears

Defense Secretary Leon Panetta has ordered cuts to military spending as a precaution in case the White House and Congress fail to agree to avert $52 billion in cuts to the Pentagon budget this year.

| Jan 16, 2013

GSA's Green Proving Ground program pushes energy efficiency

The General Services Administration, which manages a portfolio of almost 10,000 buildings, is using the Green Proving Ground program to test technological advances in energy efficiency.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021