Global digital marketing agency iProspect has selected VLKArchitects, Inc. for design services on its new Fort Worth office.
“iProspect is a very progressive online marketing agency,” states VLK Senior Associate Sloan Harris. “VLK was selected for its creative design expertise and we are excited to work with such a unique company on this project.”
Company growth prompted iProspect to make the decision to move to a new space. The company will be moving from its original location around the Stockyards in Fort Worth to the revitalized Cultural District area, off West 7th Street. “We’ve been in the Stockyards for 10 years and have loved that space,” says iProspect Managing Director Price Glomski. “We want to keep the ambiance from our Stockyards’ office location and we know VLK will be able to carry that design to our new office.”
iProspect’s new office, estimated around 25,000 sf, will focus on modernization and giving their employees a good living space. The open layout will allow employees to focus on group orientation and team building. A giant kitchen will be created to serve as the centerpiece of the office. In addition, the company wants to incorporate sustainable elements into the design. “We admire what VLK has done so far with green design and we want to embrace that in our new office,” states Glomski. BD+C
Related Stories
| Jan 3, 2012
AIA's ABI November Index reaches 52.0
The Architecture Billings Index (ABI) reached its first positive mark since August.
| Jan 3, 2012
Callison acquires Barteluce Architects & Associates
This acquisition will grow Callison’s New York team to over 75 architects.
| Jan 3, 2012
VDK Architects merges with Harley Ellis Devereaux
Harley Ellis Devereaux will relocate the employees in its current Berkeley, Calif., office to the new Oakland office location effective January 3, 2012.
| Jan 3, 2012
Weingarten, Callan appointed to BD+C Editorial Board
Building Design+Construction has named two new members to its editorial board. Both are past recipients of BD+C’s “40 Under 40” honor.
| Jan 3, 2012
New Chicago hospital prepared for pandemic, CBR terror threat
At a cost of $654 million, the 14-story, 830,000-sf medical center, designed by a Perkins+Will team led by design principal Ralph Johnson, FAIA, LEED AP, is distinguished in its ability to handle disasters.
| Jan 3, 2012
BIM: not just for new buildings
Ohio State University Medical Center is converting 55 Medical Center buildings from AutoCAD to BIM to improve quality and speed of decision making related to facility use, renovations, maintenance, and more.
| Jan 3, 2012
New SJI Rule on Steel Joists
A new rule from the Steel Joist Institute clarifies when local reinforcement of joists is required for chord loads away from panel points. SJI members offer guidance about how and when to specify loads.
| Jan 3, 2012
AIA Course: New Developments in Concrete Construction
Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.
| Jan 3, 2012
The Value of Historic Paint Investigations
An expert conservator provides a three-step approach to determining a historic building’s “period of significance”—and how to restore its painted surfaces to the correct patterns and colors.
| Jan 3, 2012
28th Annual Reconstruction Awards: Bringing Hope to Cancer Patients
A gothic-style structure is reconstructed into comfortable, modern patient residence facility for the American Cancer Society.