Hill International, a global leader in managing construction risk, has announced that its joint venture with URS Corp. has received a blanket purchase agreement from the U.S. General Services Administration to provide construction management as agent services for the U.S. Department of State's Foreign Affairs Security Training Center (FASTC) project. The five-year agreement has an estimated value to the URS/Hill joint venture of approximately $21.8 million. URS is a 60% partner in the joint venture, and Hill is a 40% partner.
The FASTC project will establish a consolidated training center for training in a wide array of law enforcement and security disciplines within the U.S. Department of State for the protection of diplomats and U.S. embassies abroad. Diplomatic security training is currently conducted at up to 19 different, geographically separated, leased and contracted facilities nationwide. The new FASTC will be a state-of-the-art facility. It is expected to provide training for 8,000-10,000 students per year, including special agents, foreign service officers, selected foreign law enforcement and other personnel.
The URS/Hill joint venture will provide construction management services during the design, construction, and commissioning phases of the FASTC project.
"Hill is proud to be partnered with URS to manage construction of a facility that will help enhance the training of law enforcement officials and ultimately improve diplomat and embassy security," said James E. Koch, Ph.D., P.E., LEED AP, F.SAME, Senior Vice President and Director of Hill's Federal Services Group. +
Related Stories
| Oct 5, 2011
GREENBUILD 2011: Software an architectural game changer
Interactive modeling software transforms the designbuild process.
| Oct 5, 2011
GREENBUILD 2011: Tile manufacturer attains third-party certification for waste recycling processes
Crossville has joined with TOTO to recycle that company’s pre-consumer fired sanitary ware.
| Oct 5, 2011
GREENBUILD 2011: Roof hatch designed for energy efficiency
The cover features a specially designed EPDM finger-type gasket that ensures a positive seal with the curb to reduce air permeability and ensure energy performance.
| Oct 4, 2011
GREENBUILD 2011
Click here for the latest news and products from Greenbuild 2011, Oct. 4-7, in Toronto.
| Oct 4, 2011
GREENBUILD 2011: Methods, impacts, and opportunities in the concrete building life cycle
Researchers at the Massachusetts Institute of Technology’s (MIT) Concrete Sustainability Hub conducted a life-cycle assessment (LCA) study to evaluate and improve the environmental impact and study how the “dual use” aspect of concrete.
| Oct 4, 2011
GREENBUILD 2011: Johnsonite features sustainable products
Products include rubber flooring tiles, treads, wall bases, and more.
| Oct 4, 2011
GREENBUILD 2011: Nearly seamless highly insulated glass curtain-wall system introduced
Low insulation value reflects value of entire curtain-wall system.
| Oct 4, 2011
GREENBUILD 2011: Ready-to-use wood primer unveiled
Maintains strong UV protection, clarity even with application of lighter, natural wood tones.
| Oct 4, 2011
GREENBUILD 2011: Two new recycled glass products announced
The two collections offer both larger and smaller particulates.
| Oct 4, 2011
GREENBUILD 2011: Mythic Paint launches two new paint products
A high performance paint, and a combination paint and primer now available.