flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

July 2012: On the Drawing Board

July 2012: On the Drawing Board

Salvation Army regional HQ; China convention center; cancer institute pavilion; campus center at North Texas.


By By Raissa Rocha, Associate Editor | July 13, 2012
This article first appeared in the July 2012 issue of BD+C.

JLL leading renewal of Salvation Army Regional Headquarters in Phoenix

The Salvation Army is planning a redevelopment of its Herberger Campus in Phoenix. A new social service and administration campus, with two new buildings and a renovated warehouse, will replace 160,000 sf of space, thereby reducing operating and maintenance costs by as much as $1.1 million per year. The plans include a 40,000-sf headquarters and a 30,000-sf social services building on the current campus, as well as six acres of land that the Salvation Army plans to develop with either a public-public or public-private partnership. Jones Lang LaSalle will provide real estate advisory and development management services, Phoenix-based Deutsch Architecture Group will serve as project architect, and Nitti Graycor, Tempe, Ariz., will be the contractor.

[pagebreak]

Sea urchin-shaped convention center in China will overlook the Bohai Sea

2DEFINE Architecture and local partner Dalian Urban Planning & Design Institute have been selected to direct the design of the Yingkou Convention and Exposition Center, a 750,000-sf facility in Yingkou, China, on the Bohai Sea. The $68 million project will be the centerpiece of a new harbor created off of a satellite business district in the city. The oblong-shaped building itself will be situated on a 14-million-sf manmade island. The convention center will feature outdoor promenades,  gardens, and a half-acre rooftop terrace. An elevated four-lane road with pedestrian walkways will connect the island to the mainland. Construction is scheduled to begin later this year.

[pagebreak]

New pavilion to welcome patients at Memorial Care Todd Cancer Institute

The new Todd Cancer Pavilion on the campus of Long Beach (Calif.) Memorial Medical Center was designed by local firms c|a ARCHITECTS and MHP Structural Engineers. The pavilion will serve as entry to the MemorialCare Todd Cancer Institute, greeting visitors with a two-story lobby, including a first-floor reception and waiting room. Renovations will be made to 66,000 sf of space on the second and third floors of an existing administration building, which will contain a new outpatient facility for the institute. Scheduled completion: March 2013.

[pagebreak]

Student campus center being readied for University of North Texas Health Science Facility

A new campus center at the University of North Texas Health Science Center is being designed by Dewberry for LEED-NC Platinum certification. The $25 million project includes dining facilities, a full-service kitchen, student lounges, meeting and office spaces for student services and organizations, and a fitness center. The building is scheduled for delivery through CM at risk. The Building Team also includes Purdy-McGuire (MEP engineer), Datum Gojer Engineers (structural engineer), and Freese and Nichols (civil engineer), all based in Texas.

Related Stories

| Apr 19, 2013

7 hip high-rise developments on the drawing board

Adrian Smith and Gordon Gill's whimsical Dancing Dragons tower in Seoul is among the compelling high-rise projects in the works across the globe.

| Jan 4, 2013

January 2013: On the Drawing Board

Fort Lauderdale performing arts center to experience upgrade and expansion; new office building in Virginia to house behavioral health services; and University of Pittsburgh planning biomed research center in Italy.

| Jan 4, 2013

December 2012: On the Drawing Board

Headquarters will house office, spaces for private education company in Massachusetts; multi-phase project will lead to new MSU Denver athletic complex; and nature preserve center seeks to protect resources, educate community.

| Jan 4, 2013

November 2012: On the Drawing Board

Foster + Partners wins competition to design 650,000-sf office tower on Manhattan’s Park Avenue; $180 million facelift under way at San Marcos High School; critical access hospital in Oregon cuts down on unnecessary space.

| Oct 4, 2012

October 2012: On the Drawing Board

Dallas mixed-use development; Vandenberg Air Force base education facility; One WTC design modifications; UNO Soccer Academy in Chicago.

| Aug 7, 2012

August 2012: On the Drawing Board

Residence Hall at University of Puget Sound; $160 million Fort Irwin Replacement Hospital; Boston residential tower; high school expansion in New York; 28-story Manhattan office tower.

| May 31, 2012

June 2012: On the Drawing Board

Modular Design Architecture > Reuse of L.A.’s historic Dunbar Hotel; new National Guard Bureau at Hanscom AFB; Valencia College’s collaboratory; Chicago warehouse turned winery; China Mobile’s new headquarters.

| May 3, 2012

May 2012: On the Drawing Board

Renovation planned for Minnesota mall; UMass Dartmouth bioprocessing lab; mixed-use project in Broward County, Fla.; luxury development in Jordan.

| Mar 30, 2012

April 2012: On the Drawing Board

LAUSD's first design-build project; Daytona Museum of Arts expansion; and more.

| Mar 2, 2012

March 2012: On the Drawing Board

Pennsylvania hospital to provide quieter patient quarters; Abu Dhabi airport terminal positions city for tourism spike; and supportive housing developments blossoming in New York boroughs. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021