When Intrinsic School, a 60,000-sf public charter school, opened last August, it represented a first for Chicago: a school designed from the ground up to blend instruction, collaboration, and technology. Each grade (7–12) is separated into a STEM and Humanities pod. Each pod has its own isolated space, either a lab or a Socratic seminar space.
Each pod has five learning environments whose names—Coastline, Exchange Table, Pop-up Class, Genius Bar, and Study Lounge—hint at the kind of individual or collaborative learning at work. “We wanted to give each space its own identity,” says Daniel Wicke, Project Architect with Wheeler Kearns Architects.
TOP K-12 SCHOOL SECTOR ARCHITECTURE FIRMS
2014 K-12 Revenue ($)
1. DLR Group $47,750,000
2. PBK $44,800,000
3. Stantec $33,419,099
4. Huckabee $32,000,000
5. Parkhill, Smith & Cooper $22,211,000SEE FULL LIST BELOW
TOP K-12 SCHOOL SECTOR ENGINEERING FIRMS
2014 K-12 Revenue ($)
1. AECOM $42,950,000
2. Jacobs $32,915,000
3. WSP | Parsons Brinckerhoff $19,669,921
4. STV $14,260,000
5. Wendel $12,188,430SEE FULL LIST BELOW
TOP K-12 SCHOOL SECTOR CONSTRUCTION FIRMS
2014 K-12 Revenue ($)
1. Turner Construction $487,394,480
2. CORE Construction $321,022,373
3. Gilbane Building Co. $299,244,295
4. Balfour Beatty US $298,793,841
5. Skanska USA $245,681,551SEE FULL LIST BELOW
Last year, $14.2 billion in school construction was completed, up 5% from 2013, according to School Planning & Management. Whether new or reconstructed, schools must meet new demands that emanate from the real world.
“School buildings and classrooms must be able to rapidly adapt to different instructional and learning modes, including teacher-centric lectures, quiet and reflective self-study and testing, and group collaboration,” says Ronald C. Weston, Vice President of Architecture at Paulus, Sokolowski and Sartor.
Tom Rogér, Vice President and K-12 Leader at Gilbane, says 21st-century schools typically include larger spaces for student-centered learning, distributed technology throughout the building, and smartboards configured for student use.
Design needs to allow learning to happen anywhere in the school, says Irene Nigaglioni, AIA, CEFP, LEED AP BD+C, Partner/National Planning Director at PBK. Walls that used to separate classrooms from hallways are being opened up to expand collaborative spaces. Libraries and cafeterias are melding together into “learning hubs,” supported by robust wireless technology.
What’s new about all these design concepts is that more school districts are willing to try them out. The reason: pushback from business leaders. “Employers are starting to complain that kids have lost the ability to be critical thinkers,” says Sandy Kate, LEED AP, REFP, Senior Educational Facility Planner at HMC Architects.
The convergence of teaching methodologies and new design practices is impacting K-12 school design. Spaces for STEM and Next Generation Science Standards require students to apply the same Design Thinking skills that architects use.
“Today’s students don’t just learn about robotics: they build robots,” says Greg Monberg, AIA, CEFP, LEED AP BD+C, Director of Design Research at Fanning Howey. “As architects, we must design environments that catalyze this Design Thinking approach to education.”
Design Thinking is at work in the Milan (Mich.) Center for Innovative Studies, a 23,000-sf project-based learning environment for high school seniors. Specialty labs surround a central “innovative zone.”
The space serves as a laboratory for student projects: building and marketing solar-powered boats, building and programming robots, and designing a load-bearing structure that withstands earthquake-like forces. Students and teachers access the labs and collaboration spaces as needed, based on each day’s activities.
TOP K-12 SCHOOL SECTOR ARCHITECTURE FIRMS
Company | 2014 K-12 School Revenue ($) | |
1 | DLR Group | $47,750,000 |
2 | PBK | $44,800,000 |
3 | Stantec | $33,419,099 |
4 | Huckabee | $32,000,000 |
5 | Parkhill, Smith & Cooper | $22,211,000 |
6 | HMC Architects | $21,107,084 |
7 | Fanning/Howey Associates | $19,623,313 |
8 | Perkins+Will | $19,240,000 |
9 | Heery International | $17,190,567 |
10 | FGM Architects | $16,601,809 |
11 | NAC|Architecture | $16,095,124 |
12 | Corgan | $15,660,000 |
13 | Moseley Architects | $15,609,087 |
14 | Perkins Eastman | $14,632,000 |
15 | Symmes Maini & McKee Associates | $14,379,782 |
16 | LPA | $14,211,122 |
17 | Quattrocchi Kwok Architects | $13,860,000 |
18 | Hord Coplan Macht | $13,100,061 |
19 | HMFH Architects | $11,911,364 |
20 | Integrus Architecture | $11,769,378 |
21 | HKS | $9,680,472 |
22 | Shive-Hattery | $8,328,659 |
23 | GWWO | $7,935,937 |
24 | Wight & Company | $7,772,876 |
25 | Legat Architects | $7,470,000 |
26 | Harvard Jolly | $6,965,592 |
27 | DLA Architects | $6,769,402 |
28 | BLDD Architects | $6,750,000 |
29 | KSQ Architects | $6,237,196 |
30 | JLG Architects | $5,894,445 |
31 | SEI Design Group | $5,837,700 |
32 | Eppstein Uhen Architects | $5,582,172 |
33 | BBS Architects and Engineers | $5,520,000 |
34 | CTA Architects Engineers | $5,325,260 |
35 | Harley Ellis Devereaux | $5,210,000 |
36 | S/L/A/M Collaborative, The | $5,091,626 |
37 | Schenkel & Shultz | $5,044,000 |
38 | LS3P | $4,992,588 |
39 | Goodwyn Mills and Cawood | $4,939,235 |
40 | Ashley McGraw Architects | $4,886,347 |
41 | FXFOWLE Architects | $4,752,223 |
42 | Little | $4,431,000 |
43 | Cuningham Group Architecture | $4,413,753 |
44 | Zyscovich Architects | $4,007,233 |
45 | BRPH | $3,808,227 |
46 | SRG Partnership | $3,476,177 |
47 | EYP | $3,447,014 |
48 | Cooper Carry | $3,417,026 |
49 | EwingCole | $3,391,000 |
50 | Schrader Group Architecture | $2,968,616 |
51 | Clark Nexsen | $2,500,000 |
52 | Becker Morgan Group | $2,422,634 |
53 | PBDW Architects | $2,372,212 |
54 | RS&H | $2,345,000 |
55 | Leo A Daly | $2,178,404 |
56 | Good Fulton & Farrell | $2,100,140 |
57 | Ennead Architects | $2,048,000 |
58 | Dattner Architects | $1,819,345 |
59 | Shepley Bulfinch | $1,709,868 |
60 | Kirksey Architecture | $1,634,400 |
61 | Hastings+Chivetta Architects | $1,566,001 |
62 | Environetics | $1,468,746 |
63 | Smallwood, Reynolds, Stewart, Stewart & Associates, Inc. |
$1,378,755 |
64 | LMN Architects | $1,327,200 |
65 | Gensler | $1,220,000 |
66 | Glumac | $1,183,752 |
67 | OZ Architecture | $1,183,250 |
68 | Architects Hawaii Ltd. | $1,140,000 |
69 | Mithun | $1,125,000 |
70 | Massa Multimedia Architecture | $1,000,000 |
71 | Solomon Cordwell Buenz | $993,177 |
72 | Moody Nolan | $983,143 |
73 | NORR | $572,861 |
74 | Bergmann Associates | $570,618 |
75 | Beyer Blinder Belle | $544,819 |
76 | Westlake Reed Leskosky | $500,000 |
77 | DesignGroup | $495,865 |
78 | Hoffmann Architects | $401,000 |
79 | Morris Architects | $395,000 |
80 | Nelson | $368,390 |
81 | CASCO Diversified Corp. | $350,000 |
82 | Ziegler Cooper | $348,762 |
83 | Ware Malcomb | $338,041 |
84 | Rosser International | $312,000 |
85 | STG Design | $192,000 |
86 | JRS Architect | $185,000 |
87 | BWBR | $180,099 |
88 | LK Architecture | $150,000 |
89 | Lord Aeck Sargent | $147,481 |
90 | Nadel | $140,000 |
91 | GBBN Architects | $130,000 |
92 | CO Architects | $129,000 |
93 | ATA Beilharz Architects | $122,715 |
94 | KZF Design | $120,403 |
95 | FM Group | $110,000 |
96 | Sherlock, Smith & Adams | $93,000 |
97 | Davis Brody Bond | $62,800 |
98 | Cambridge Seven Associates | $50,000 |
99 | Hnedak Bobo Group | $26,000 |
100 | BSA LifeStructures | $20,664 |
TOP K-12 SCHOOL SECTOR ENGINEERING FIRMS
Company | 2014 K-12 School Revenue ($) | |
1 | AECOM | $42,950,000 |
2 | Jacobs | $32,915,000 |
3 | WSP | Parsons Brinckerhoff | $19,669,921 |
4 | STV | $14,260,000 |
5 | Wendel | $12,188,430 |
6 | TTG | $6,593,145 |
7 | KCI Technologies | $5,000,000 |
8 | Dewberry | $4,091,008 |
9 | LaBella Associates | $3,964,943 |
10 | KJWW Engineering Consultants | $3,909,480 |
11 | Wiss, Janney, Elstner Associates | $3,180,000 |
12 | Simpson Gumpertz & Heger | $2,956,000 |
13 | Bridgers & Paxton Consulting Engineers | $2,938,452 |
14 | Thornton Tomasetti | $2,865,201 |
15 | M/E Engineering | $2,647,272 |
16 | KPFF Consulting Engineers | $2,542,000 |
17 | Coffman Engineers | $2,527,000 |
18 | Henderson Engineers | $2,464,815 |
19 | Walter P Moore | $2,285,771 |
20 | Peter Basso Associates | $2,106,000 |
21 | TLC Engineering for Architecture | $2,097,212 |
22 | RDK Engineers | $1,844,000 |
23 | P2S Engineering | $1,623,232 |
24 | Primera Engineers | $1,557,585 |
25 | Wallace Engineering | $1,540,000 |
26 | H.F. Lenz Company | $1,412,160 |
27 | Highland Associates | $1,400,000 |
28 | William Tao & Associates | $1,197,158 |
29 | Martin/Martin | $1,195,119 |
30 | Heapy Engineering | $1,107,742 |
31 | Rist-Frost-Shumway Engineering | $1,000,000 |
32 | OLA Consulting Engineers | $976,000 |
33 | RMF Engineering | $850,000 |
34 | Karpinski Engineering | $810,000 |
35 | Jensen Hughes | $750,000 |
36 | CJL Engineering | $726,128 |
37 | Zak Companies | $690,375 |
38 | SSOE Group | $678,365 |
39 | G&W Engineering | $615,500 |
40 | Vanderweil Engineers | $591,000 |
41 | KLH Engineers | $580,716 |
42 | Newcomb & Boyd | $556,032 |
43 | I. C. Thomasson Associates | $510,000 |
44 | ME Engineers | $500,000 |
45 | Cardno Haynes Whaley | $476,525 |
46 | CTLGroup | $400,000 |
47 | Larson Design Group | $395,365 |
48 | Davis, Bowen & Friedel | $361,203 |
49 | Arup | $266,381 |
50 | Environmental Systems Design | $254,052 |
51 | Mazzetti | $158,731 |
52 | Dunham Associates | $150,000 |
53 | Wick Fisher White | $117,000 |
54 | GRW | $105,329 |
55 | Spectrum Engineers | $98,304 |
TOP K-12 SCHOOL SECTOR CONSTRUCTION FIRMS
Company | 2014 K-12 School Revenue ($) | |
1 | Turner Construction | $487,394,480 |
2 | CORE Construction | $321,022,373 |
3 | Gilbane Building Co. | $299,244,295 |
4 | Balfour Beatty US | $298,793,841 |
5 | Skanska USA | $245,681,551 |
6 | Barton Malow | $212,395,000 |
7 | McCarthy Holdings | $207,151,453 |
8 | Kraus-Anderson Construction | $197,000,000 |
9 | JE Dunn Construction | $140,673,512 |
10 | Whiting-Turner Contracting, The | $131,028,860 |
11 | Bernards | $129,000,000 |
12 | Swinerton Builders | $115,569,000 |
13 | Adolfson & Peterson Construction | $112,832,110 |
14 | Consigli Building Group | $103,449,970 |
15 | McShane Companies, The | $89,260,239 |
16 | Lend Lease | $74,341,000 |
17 | Hill & Wilkinson | $69,675,128 |
18 | Flintco | $65,800,000 |
19 | LeChase Construction Services | $64,000,000 |
20 | Yates Companies, The | $61,400,000 |
21 | Shawmut Design and Construction | $52,500,000 |
22 | Ryan Companies | $50,072,265 |
23 | PCL Construction | $48,472,010 |
24 | Wight & Company | $37,763,321 |
25 | Suffolk Construction | $37,503,531 |
26 | Haselden Construction | $34,179,809 |
27 | Sundt Construction | $33,641,526 |
28 | S. M. Wilson & Co. | $33,110,800 |
29 | Power Construction | $32,000,000 |
30 | Beck Group, The | $30,717,952 |
31 | Clark Group | $28,643,045 |
32 | KBE Building Corp. | $26,411,401 |
33 | Structure Tone | $25,000,000 |
34 | Manhattan Construction | $24,287,000 |
35 | O'Neil Industries | $23,587,752 |
36 | Pepper Construction Group | $23,571,000 |
37 | W. M. Jordan | $18,946,109 |
38 | LPCiminelli | $18,375,567 |
39 | Walbridge | $17,830,000 |
40 | C.W. Driver | $16,630,000 |
41 | Leopardo Companies | $16,337,962 |
42 | Coakley & Williams Construction | $16,174,783 |
43 | Stalco Construction | $15,800,000 |
44 | Batson-Cook | $15,513,744 |
45 | Boldt Company, The | $14,884,526 |
46 | James G Davis Construction | $14,646,094 |
47 | Kitchell Corporation | $13,549,571 |
48 | Brasfield & Gorrie | $12,229,410 |
49 | Bette Companies, The | $11,569,819 |
50 | Fortis Construction | $11,000,000 |
51 | Robins & Morton | $11,000,000 |
52 | HITT Contracting | $10,000,000 |
53 | Hill International | $9,000,000 |
54 | EMJ | $5,950,247 |
55 | Walsh Group, The | $5,858,389 |
56 | Weitz Company, The | $4,979,000 |
57 | Doster Construction | $4,914,214 |
58 | Linbeck Group | $4,000,000 |
59 | BlueScope Construction | $2,870,000 |
60 | James McHugh Construction | $2,489,680 |
RETURN TO THE GIANTS 300 LANDING PAGE
Related Stories
Codes and Standards | Mar 15, 2024
Technical brief addresses the impact of construction-generated moisture on commercial roofing systems
A new technical brief from SPRI, the trade association representing the manufacturers of single-ply roofing systems and related component materials, addresses construction-generated moisture and its impact on commercial roofing systems.
Sports and Recreational Facilities | Mar 14, 2024
First-of-its-kind sports and rehabilitation clinic combines training gym and healing spa
Parker Performance Institute in Frisco, Texas, is billed as a first-of-its-kind sports and rehabilitation clinic where students, specialized clinicians, and chiropractic professionals apply neuroscience to physical rehabilitation.
Market Data | Mar 14, 2024
Download BD+C's March 2024 Market Intelligence Report
U.S. construction spending on buildings-related work rose 1.4% in January, but project teams continue to face headwinds related to inflation, interest rates, and supply chain issues, according to Building Design+Construction's March 2024 Market Intelligence Report (free PDF download).
Apartments | Mar 13, 2024
A landscaped canyon runs through this luxury apartment development in Denver
Set to open in April, One River North is a 16-story, 187-unit luxury apartment building with private, open-air terraces located in Denver’s RiNo arts district. Biophilic design plays a central role throughout the building, allowing residents to connect with nature and providing a distinctive living experience.
Sustainability | Mar 13, 2024
Trends to watch shaping the future of ESG
Gensler’s Climate Action & Sustainability Services Leaders Anthony Brower, Juliette Morgan, and Kirsten Ritchie discuss trends shaping the future of environmental, social, and governance (ESG).
Affordable Housing | Mar 12, 2024
An all-electric affordable housing project in Southern California offers 48 apartments plus community spaces
In Santa Monica, Calif., Brunson Terrace is an all-electric, 100% affordable housing project that’s over eight times more energy efficient than similar buildings, according to architect Brooks + Scarpa. Located across the street from Santa Monica College, the net zero building has been certified LEED Platinum.
Museums | Mar 11, 2024
Nebraska’s Joslyn Art Museum to reopen this summer with new Snøhetta-designed pavilion
In Omaha, Neb., the Joslyn Art Museum, which displays art from ancient times to the present, has announced it will reopen on September 10, following the completion of its new 42,000-sf Rhonda & Howard Hawks Pavilion. Designed in collaboration with Snøhetta and Alley Poyner Macchietto Architecture, the Hawks Pavilion is part of a museum overhaul that will expand the gallery space by more than 40%.
Affordable Housing | Mar 11, 2024
Los Angeles’s streamlined approval policies leading to boom in affordable housing plans
Since December 2022, Los Angeles’s planning department has received plans for more than 13,770 affordable units. The number of units put in the approval pipeline in roughly one year is just below the total number of affordable units approved in Los Angeles in 2020, 2021, and 2022 combined.
BIM and Information Technology | Mar 11, 2024
BIM at LOD400: Why Level of Development 400 matters for design and virtual construction
As construction projects grow more complex, producing a building information model at Level of Development 400 (LOD400) can accelerate schedules, increase savings, and reduce risk, writes Stephen E. Blumenbaum, PE, SE, Walter P Moore's Director of Construction Engineering.
AEC Tech | Mar 9, 2024
9 steps for implementing digital transformation in your AEC business
Regardless of a businesses size and type, digital solutions like workflow automation software, AI-based analytics, and integrations can significantly enhance efficiency, productivity, and competitiveness.