flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

K-12 Schools Report: ‘A lot of pent-up need,’ with optimism for ’13

K-12 Schools Report: ‘A lot of pent-up need,’ with optimism for ’13

The Giants 300 Top 25 AEC Firms in the K-12 Schools Sector.


By By BD+C Staff | July 20, 2012
The $29 million Lady Bird Johnson Middle School, in Irving, Texas, isat 152,000
The $29 million Lady Bird Johnson Middle School, in Irving, Texas, isat 152,000 sfthe largest net-zero energy public school in
This article first appeared in the July 2012 issue of BD+C.

School districts are demanding project-based learning environments that use a combination of extreme flexibility and the latest technology to support different styles of learning, says Daniel R. Mader, AIA, REFP, LEED AP, CEO of Fanning Howey.

“There’s a lot of pent-up need out there, but educational communities are waiting for more proof of a recovery,” says Mader. “There seems to be more optimism for being able to address capital needs in 2013.”

High on school districts’ list: energy-efficient design to lower O&M costs. +

 

 

TOP 25 K-12 SCHOOL SECTOR ARCHITECTURE FIRMS

Rank Company 2011 K-12 Revenue ($)
1 DLR Group 38,000,000
2 PBK 31,660,000
3 SHW Group 31,417,872
4 Fanning/Howey Associates 29,170,000
5 HMC Architects 25,407,316
6 LPA 20,630,363
7 Heery International 20,499,000
8 IBI Group 20,154,278
9 Perkins+Will 16,220,132
10 NAC|Architecture 15,340,409
11 Moseley Architects 15,230,000
12 NTD Architecture 14,377,522
13 Perkins Eastman 14,300,000
14 Tetra Tech Architects & Engineers 13,200,000
15 SMMA|Symmes Maini & McKee Associates 10,395,653
16 Corgan Associates 10,177,000
17 SEI Design Group 7,836,000
18 FGM Architects 7,691,587
19 Fletcher-Thompson 7,500,000
20 S/L/A/M Collaborative, The 6,710,914
21 Ashley McGraw Architects 6,460,000
22 DLA Architects 5,240,000
23 Harley Ellis Devereaux 4,800,000
24 LS3P Associates 4,541,486
25 CTA Architects Engineers 4,155,200

 

TOP 25 K-12 SCHOOL SECTOR ENGINEERING FIRMS

Rank Company 2011 K-12 Revenue ($)
1 URS Corp. 63,000,000
2 AECOM Technology Corp. 42,000,000
3 Jacobs 31,000,000
4 STV 24,338,000
5 Parsons Brinckerhoff 21,900,000
6 BRPH 12,000,000
7 TTG|TMAD Taylor & Gaines 11,521,550
8 Stantec 8,460,000
9 Dewberry 8,033,356
10 Shive-Hattery 7,807,781
11 KJWW Engineering Consultants 5,289,070
12 Birdsall Services Group 4,750,000
13 James Posey Associates 4,700,000
14 KCI Technologies 4,500,000
15 Aon Fire Protection Engineering 4,000,000
16 KPFF Consulting Engineers 4,000,000
17 L.R. Kimball 3,962,000
18 M/E Engineering 3,890,000
19 Thornton Tomasetti 3,229,836
20 Atkins North America 3,112,115
21 Coffman Engineers 3,000,000
22 AKF Group 2,800,000
23 Wiss, Janney, Elstner Associates 2,708,000
24 RDK Engineers 2,550,000
25 Middough 2,500,000

 

TOP 25 K-12 SCHOOL SECTOR CONSTRUCTION FIRMS

Rank Company 2011 K-12 Revenue ($)
1 Gilbane Building Co. 666,177,000
2 Balfour Beatty US 526,376,172
3 Turner Corporation, The 412,272,000
4 McCarthy Holdings 383,000,000
5 CORE Construction 232,866,651
6 Kraus-Anderson Construction 201,300,000
7 Consigli Construction 181,349,159
8 Hensel Phelps Construction 156,030,000
9 Suffolk Construction 148,781,095
10 Skanska USA 141,153,171
11 Flintco 130,000,000
12 McShane Companies, The 125,000,000
13 Barton Malow 121,621,680
14 JE Dunn Construction 101,004,174
15 Shawmut Design and Construction 98,300,000
16 Pepper Construction Group 95,019,000
17 C.W. Driver 93,913,000
18 Sundt Construction 80,095,300
19 PCL Construction Enterprises 75,876,100
20 Doster Construction 75,831,418
21 Tutor Perini Corp. 72,470,000
22 Bernards 70,500,000
23 Walbridge 70,500,000
24 Clark Group 69,011,298
25 S. M. Wilson & Co. 63,746,990

Related Stories

Student Housing | Apr 19, 2024

$115 million Cal State Long Beach student housing project will add 424 beds

A new $115 million project recently broke ground at California State University, Long Beach (CSULB) that will add housing for 424 students at below-market rates. The 108,000 sf La Playa Residence Hall, funded by the State of California’s Higher Education Student Housing Grant Program, will consist of three five-story structures connected by bridges.

Construction Costs | Apr 18, 2024

New download: BD+C's April 2024 Market Intelligence Report

Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.

MFPRO+ New Projects | Apr 16, 2024

Marvel-designed Gowanus Green will offer 955 affordable rental units in Brooklyn

The community consists of approximately 955 units of 100% affordable housing, 28,000 sf of neighborhood service retail and community space, a site for a new public school, and a new 1.5-acre public park.

Construction Costs | Apr 16, 2024

How the new prevailing wage calculation will impact construction labor costs

Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.

Healthcare Facilities | Apr 16, 2024

Mexico’s ‘premier private academic health center’ under design

The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.

Market Data | Apr 16, 2024

The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024

Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.

Laboratories | Apr 15, 2024

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.

Codes and Standards | Apr 12, 2024

ICC eliminates building electrification provisions from 2024 update

The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.

Urban Planning | Apr 12, 2024

Popular Denver e-bike voucher program aids carbon reduction goals

Denver’s e-bike voucher program that helps citizens pay for e-bikes, a component of the city’s carbon reduction plan, has proven extremely popular with residents. Earlier this year, Denver’s effort to get residents to swap some motor vehicle trips for bike trips ran out of vouchers in less than 10 minutes after the program opened to online applications.

Laboratories | Apr 12, 2024

Life science construction completions will peak this year, then drop off substantially

There will be a record amount of construction completions in the U.S. life science market in 2024, followed by a dramatic drop in 2025, according to CBRE. In 2024, 21.3 million sf of life science space will be completed in the 13 largest U.S. markets. That’s up from 13.9 million sf last year and 5.6 million sf in 2022.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021