flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Kansas City International Airport’s new terminal breaks ground

Airports

Kansas City International Airport’s new terminal breaks ground

SOM designed the project.


By David Malone, Managing Editor | August 13, 2021
KC International Airport Terminal exterior
All renderings courtesy SOM

Kansas City International Airport’s new 1 million-sf terminal has broken ground. The project, which is designed by SOM, will set a new standard for inclusivity and accessibility.

The 39-gate terminal will have the flexibility to expand to 50 gates in the future. At the entrance, a large overhang, supported by structurally expressed Y columns, and a glass facade will create a grand and transparent space while retail spaces and two concourses will step down toward a human scale. The rhythmic expressed steel structural system is balanced by a natural wood inlay to provide inviting spaces for passengers. Outdoor waiting areas will leverage the site’s surrounding natural landscape to provide a calming space.

KC International Airport Terminal entrance

The design forgoes creating a sprawling terminal and instead focuses on quick and seamless transitioning with a compact layout: walking distances are kept to a minimum, check-in and security are consolidated into one space, and a dual-level roadway will separate the vehicular traffic between arrivals and departures, with the terminal’s entrance and passenger-parking facilities located on either side to make the entire airport walkable.

The terminal will feature a variety of spaces with the goal of increasing inclusivity and accessibility. A multi-sensory room will provide a quiet and secure place for people with autism, dementia, or sensory processing disorders. An airplane simulation room will help people with anxiety or other conditions that create a fear of flying. This room allows people in experience and fear about air travel through true-to-life objects like a ticketing kiosk, gate door, passenger boarding bridge, and simulated aircraft cabin.

KC International Airport Terminal ticketing counters

Other inclusivity and accessibility features include a meditation room, a family play zone, all gender restrooms, family restrooms, infant nursing rooms, service animal relief areas, and adult-assist changing rooms.

In addition to SOM, the build team also includes Edgemoor Infrastructure & Real Estate (developer), and Clark | Weitz | Clarkson (design-builder).

The new terminal is targeting LEED Gold certification. The project is slated for completion in 2023.

KC International Airport Terminal overhang

KC International Airport Terminal interior

Tags

Related Stories

Airports | Sep 11, 2017

Terminal modernization: Why bother? Part I

A terminal modernization program can be a complicated and expensive task that airport operators may be hesitant to undertake unless necessitated by demands for increased capacity. This is the first post in our series examining why airport operators should bother to upgrade their facilities, even if capacity isn’t forcing the issue.   

Hotel Facilities | Jul 5, 2017

It only took 26 days to complete construction on the Crowne Plaza Changi Airport hotel extension

PPVC techniques allowed the project to save time and manpower.

Airports | Jun 26, 2017

Newark Liberty International Airport breaks ground on $2.4 billion redevelopment project

The project includes a new 1 million-sf terminal building with 33 domestic aircraft gates.

Building Team Awards | Jun 8, 2017

Missing link: Denver International Airport and Transit Center

Gold Award: A new mixed-use transit center fulfills Denver’s 28-year plan to improve access to the nation’s fifth-busiest airport.

Airports | May 15, 2017

Five trends for airport retail

CallisonRTKL Vice President Kevin Horn pinpoints how travel retail is changing dramatically.

Reconstruction & Renovation | Mar 16, 2017

Pols are ready to spend $1T on rebuilding America’s infrastructure. But who will pick which projects benefit?

The accounting and consulting firm PwC offers the industrial sector a five-step approach to getting more involved in this process.

Airports | Feb 23, 2017

New Orleans Airport to add five additional gates and $110 million to current expansion

The project is being hailed as the city’s most transformative since the construction of the Superdome.

Projects | Jan 25, 2017

Trump prioritizes infrastructure projects, as rebuilding America is now a hot political potato

Both parties are talking about $1 trillion in spending over the next decade. How projects will be funded, though, remains unresolved.

Airports | Jan 17, 2017

JFK Airport set for $10 billion renovation

In addition to the airport itself, the overhaul will also improve road and rail access to meet projected passenger growth.

Airports | Dec 6, 2016

Phoenix Sky Harbor International Airport creates a destination inside Terminal 3

DWL Architects, SmithGroupJJR, and Corgan design passenger experience that connects to the surrounding city and Sonoran desert landscape.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021