flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Kettering University’s new Learning Commons includes a student entrepreneur lab

University Buildings

Kettering University’s new Learning Commons includes a student entrepreneur lab

Stantec designed the project.


By David Malone, Associate Editor | February 20, 2020

Courtesy Stantec

The 105,000-sf Learning Commons at Kettering University will become a new academic hub for the school that includes collaboration spaces, a library, an auditorium, access points for information resources, dining facilities, and a student worker space that focuses on mobility and artificial intelligence.

The Stantec-designed space will include a Design and Entrepreneur Lab where students can meet, make, create, and explore. The space includes a two-story glass wall showcasing the Kettering student experience from the west entry. The Media Resource Center will offer support and resources to students including an IT Help Desk and Media Specialist Kiosks for assistance with material retrieval and education support. Meanwhile, the Gallery Connector will open up to four full stories through the open air atrium and is topped by a skylight that fills the interior space with natural light. 

 

See Also: Ciel Tower will be the tallest hotel in the world

 

The $63 million project also includes numerous sustainable features such as:

  • Upper floors that are turned above the lower floors to reorient the building to the primary north-south axis, setting a new geometric alignment while optimizing passive energy performance by allowing for solar control and orientation
  • Rooftop spaces and outdoor learning environments 
  • All primary mechanical and electrical equipment is located indoors to extend its operational life and to allow for the selection of high-performance equipment that can be easily maintained for optimal performance

The project is expected to be completed by spring 2022.

Related Stories

University Buildings | Aug 22, 2018

Skanska completes James Madison University’s new dining hall

The three-story building will open for fall semester 2018.

University Buildings | Aug 14, 2018

Following in the Ryan Fieldhouse’s footsteps, Northwestern University’s Walter Athletics Center officially opens

Perkins+Will designed both the Ryan Fieldhouse and the new Walter Athletics Center.

University Buildings | Aug 6, 2018

Academic honors: The importance of residence halls

Three recent projects demonstrate the dynamic role residence halls are playing on America’s college and university campuses.

University Buildings | Jul 30, 2018

University trends 2018: Schools are desperately searching for ways to economize

Though the U.S. economy is strong with investment gains buoying endowments, colleges and universities face pressures to economize and stretch their capital budgets.

Multifamily Housing | Jul 13, 2018

Student housing vs. multifamily housing—what are the differences?

While student and multi-family housing share a common building form, it’s the student resident that drives the innovation of new spaces.

University Buildings | Jul 5, 2018

Brown University’s Engineering Research Center increases the university’s School of Engineering lab space by 30%

KieranTimberlake designed the facility and Shawmut Design and Construction was the general contractor.

University Buildings | Jun 25, 2018

Virginia Commonwealth has at least three major expansion projects under construction

New buildings for outpatient care, engineering, and rehabilitation of serious injuries and debilities are scheduled to be completed in 2020.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021