flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Kirchhoff-Consigli begins Phase 2 renovations at FDR Presidential Library and Museum

Kirchhoff-Consigli begins Phase 2 renovations at FDR Presidential Library and Museum

EYP Architecture & Engineering is architect for the $35 million National Archives Administration project.


By By BD+C Staff | February 6, 2012
Americas first presidential library, and the only one used by a sitting president, was conceived and built under President Roos

Kirchhoff-Consigli Construction Management (KCCM) has begun Phase 2 of the first major restoration of the Franklin D. Roosevelt Presidential Library and Museum since 1972, when two wings were added in honor of Eleanor Roosevelt. America’s first presidential library, and the only one used by a sitting president, was conceived and built under President Roosevelt’s direction and opened to the public in 1941.

The current renovation will carefully preserve the building’s historic appearance, while bringing its archives and museum up to the National Archive’s standards for the long-term preservation of historic collections. Architect for the project is EYP Architecture & Engineering.

Phase 2 involves restoration of the historic exterior including masonry walls, sheet metal roofing, windows and doors, as well as increasing exhibition space to allow for the installation of a new permanent exhibit opening in summer of 2013. All work is being managed in and around the occupied building, ensuring that visitors are still able to access the collections and tour the site.

Phase 1 of the restoration was recently completed by KCCM on time and on schedule with no disruption to the viewing public. The first phase included new slate roofing, drainage, and plumbing systems, as well as new electrical, security and fire protection systems and adaptations for ADA compliance. BD+C

Related Stories

| Aug 19, 2011

Enhanced acoustical design

Ambient noise levels in some facility types are trending up and becoming a barrier to clear communication between building occupants.

| Jul 22, 2011

The Right Platform for IPD

Workstations for successful integrated project delivery, a white paper by Dell and BD+C.

| Jul 22, 2011

High-performance windows and doors

Learning objectives After reading this article, you should be able to: Understand issues of thermal performance and energy efficiency in relation to window and door systems; describe optimal detailing of the window-wall interface and how it contributes to building performance, sustainability, and occupant well-being; understand how durability contributes to sustainable windows/doors; and list sustainable O&M requirements for window and door systems.

| Jul 21, 2011

Falling Architecture Billings Index reflects decrease in design demands

This months Architecture Billings Index (ABI), provided by the American Institute of Architects, is almost a full point lower than last month’s reported score. June’s reading of 47.2 was short of the required 50 to achieve billings increases, making July’s reading of 46.3 an unwelcome sign of market tidings.

| Jun 29, 2011

New leadership role for architects in net-zero design

BD+C Editorial Director Rob Cassidy talks with RNL Design's Tom Hootman, AIA, about the changing role of architects in net-zero designs.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021