flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

KPF designs three-building San Jose office campus

Office Buildings

KPF designs three-building San Jose office campus

The project will be adjacent to Google's planned eight million square foot transit village and Diridon Station.


By David Malone, Associate Editor | May 15, 2020
Platform 16 exterior aerial

Courtesy Plompmozes for KPF.

Platform 16, a 1,200,000-sf, three-building office campus, has recently broken ground in Downtown San Jose. The Kohn Pedersen Fox-designed project will be located on a 5.4-acre site adjacent to Google's planned transit village and Diridon Station, a major Bay Area transportation hub.

Platform 16 will include a main facade with three module orientations (center, left, and right) to create a sense of depth and texture by breaking down the building's scale and creating a shimmering effect in the sun's reflection. The low, horizontal mass recedes from the street as it steps up to create large terraces at every level. These terraces will provide significant outdoor space for tenants, while also bringing daylight deep into Platform 16's interiors. The bronze terrace facade will contrast with the main wall in materiality and scale.

 

Platform 16 facade and exterior spaceCourtesy Plompmozes for KPF.

 

The project's combination of a high-performance facade, passive cooling systems, high efficiency lighting systems, and a solar PV roof covering 20% of the building have the building projected to outperform the AIA 2030 Commitment goal of 80% reduction against its baseline.

 

See Also: A resort with a giant artificial wave basin is being planned for southern California

 

Platform 16 will also provide immediate pedestrian access to the neighborhood and transit access to the Bay Area at large. On its south side, San Pedro Square will become a flexible public realm with access to the city's financial center, the SAP Center, and Diridon Station.

 

Platform 16 exterior courtyard between buildingsCourtesy Plompmozes for KPF.

 

Other project features include various active pedestrian plazas, expansive floorplates, and 15-foot floor-to-floor heights. 

The first phase of construction is slated for completion in 2023.

 

Platform 16 as viewed from across the streetCourtesy KPF.

 

Platform 16 outdoor terrace spaceCourtesy Byencore for KPF.

 

PLatform 16 interior spaceCourtesy Byencore for KPF.

 

Platform 16 interiorCourtesy Byencore for KPF.

 

Platform 16 interior office spaceCourtesy Byencore for KPF.

 

Platform 16 indoor/outdoor spaceCourtesy Byencore for KPF.

 

Platform 16 exterior at nightCourtesy Plompmozes for KPF.

Related Stories

Office Buildings | Sep 17, 2018

TaylorMade Canada HQ includes golf laboratory and product showroom

ZZen Design Build was the general contractor for the project.

Office Buildings | Sep 5, 2018

Facebook’s new Frank Gehry-designed Menlo Park HQ extension includes a massive green roof

Level 10 Construction was the general contractor for the project.

Office Buildings | Aug 27, 2018

The open office isn't dead

The degree of open or enclosed doesn't matter in high-performing work environments. If the space is designed to function well, all individual space types are rated as equally effective.

Office Buildings | Aug 17, 2018

An elliptical office building goes with the flow in Boston

Exterior design cuts waste, saves energy, says Building Team members.

Office Buildings | Aug 14, 2018

Flexibility tops office workers' wish lists, followed by healthcare

A survey of 1,000 office workers in the US and UK found that men value health insurance above any other work perk, whereas women would prefer more flexibility in their office job.

Office Buildings | Aug 13, 2018

There's more to the open office than headlines suggest

A study found that contrary to popular belief, the open office did not encourage—but rather, inhibited—face-to-face communication.

Office Buildings | Jul 31, 2018

Office trends 2018: Campus consolidations bring people together

Companies create community-rich work environments where employees can thrive.

Office Buildings | Jul 25, 2018

New study on occupant comfort advances Saint Gobain’s design approach for renovation and new construction

The building products giant gauges its employees’ perceptions of old and new headquarters environments.

Office Buildings | Jul 18, 2018

A day in the life of an ‘agile worker’

When our Gensler La Crosse office relocated last year, we leveraged the opportunity to support an agile workplace strategy (aka, no assigned seating). Here’s what I’ve experienced firsthand.

Office Buildings | Jul 17, 2018

Transwestern report: Office buildings near transit earn 65% higher lease rates

Analysis of 15 major metros shows the average rent in central business districts was $43.48/sf for transit-accessible buildings versus $26.01/sf for car-dependent buildings.

boombox1
boombox2
native1

More In Category



Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.


MFPRO+ News

San Francisco unveils guidelines to streamline office-to-residential conversions

The San Francisco Department of Building Inspection announced a series of new building code guidelines clarifying adaptive reuse code provisions and exceptions for converting office-to-residential buildings. Developed in response to the Commercial to Residential Adaptive Reuse program established in July 2023, the guidelines aim to increase the viability of converting underutilized office buildings into housing by reducing regulatory barriers in specific zoning districts downtown. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021