flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

KPF designs three-building San Jose office campus

Office Buildings

KPF designs three-building San Jose office campus

The project will be adjacent to Google's planned eight million square foot transit village and Diridon Station.


By David Malone, Associate Editor | May 15, 2020
Platform 16 exterior aerial

Courtesy Plompmozes for KPF.

Platform 16, a 1,200,000-sf, three-building office campus, has recently broken ground in Downtown San Jose. The Kohn Pedersen Fox-designed project will be located on a 5.4-acre site adjacent to Google's planned transit village and Diridon Station, a major Bay Area transportation hub.

Platform 16 will include a main facade with three module orientations (center, left, and right) to create a sense of depth and texture by breaking down the building's scale and creating a shimmering effect in the sun's reflection. The low, horizontal mass recedes from the street as it steps up to create large terraces at every level. These terraces will provide significant outdoor space for tenants, while also bringing daylight deep into Platform 16's interiors. The bronze terrace facade will contrast with the main wall in materiality and scale.

 

Platform 16 facade and exterior spaceCourtesy Plompmozes for KPF.

 

The project's combination of a high-performance facade, passive cooling systems, high efficiency lighting systems, and a solar PV roof covering 20% of the building have the building projected to outperform the AIA 2030 Commitment goal of 80% reduction against its baseline.

 

See Also: A resort with a giant artificial wave basin is being planned for southern California

 

Platform 16 will also provide immediate pedestrian access to the neighborhood and transit access to the Bay Area at large. On its south side, San Pedro Square will become a flexible public realm with access to the city's financial center, the SAP Center, and Diridon Station.

 

Platform 16 exterior courtyard between buildingsCourtesy Plompmozes for KPF.

 

Other project features include various active pedestrian plazas, expansive floorplates, and 15-foot floor-to-floor heights. 

The first phase of construction is slated for completion in 2023.

 

Platform 16 as viewed from across the streetCourtesy KPF.

 

Platform 16 outdoor terrace spaceCourtesy Byencore for KPF.

 

PLatform 16 interior spaceCourtesy Byencore for KPF.

 

Platform 16 interiorCourtesy Byencore for KPF.

 

Platform 16 interior office spaceCourtesy Byencore for KPF.

 

Platform 16 indoor/outdoor spaceCourtesy Byencore for KPF.

 

Platform 16 exterior at nightCourtesy Plompmozes for KPF.

Related Stories

Glass and Glazing | Mar 5, 2018

New $5 Billion Apple Headquarters Has a Glass Problem

The substantial use of glass on the interior of Apple Park has caused headaches for some employees, literally.

Office Buildings | Mar 2, 2018

Give your HQ some heart: Creating branded workplaces

These days, if your office space isn’t a true reflection of your brand, you’ve missed a big opportunity to connect with your audience.

Office Buildings | Feb 23, 2018

Why the 'cultural fit' doesn't fit

Evidence shows that companies that hire on or emphasize cultural fit struggle to innovate and change.

Office Buildings | Feb 20, 2018

New Tommy Bahama HQ looks to ‘Make Life One Long Weekend’ for its employees

Approximately 400 employees will occupy the SkB Architects-designed space.

Office Buildings | Feb 13, 2018

Office market vacancy rate at 10-year low

Cautious development and healthy absorption across major markets contributed to the decline in vacancy, according to a new Transwestern report.

Office Buildings | Feb 8, 2018

Custom home or corporate office? Investment firm wanted both

Designed by Vertical Arts Architecture, the building features design elements found in high-end custom homes in the region.

Office Buildings | Feb 8, 2018

The American Psychiatric Association moves into The Wharf

The new office occupies 3 floors at 800 Main Avenue SW.

boombox1
boombox2
native1

More In Category



Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.


MFPRO+ News

San Francisco unveils guidelines to streamline office-to-residential conversions

The San Francisco Department of Building Inspection announced a series of new building code guidelines clarifying adaptive reuse code provisions and exceptions for converting office-to-residential buildings. Developed in response to the Commercial to Residential Adaptive Reuse program established in July 2023, the guidelines aim to increase the viability of converting underutilized office buildings into housing by reducing regulatory barriers in specific zoning districts downtown. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021