flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

KU Jayhawks take a gander at a P3 development

University Buildings

KU Jayhawks take a gander at a P3 development

Kansas is in the RFP stage of its first P3 project, a new “gateway” housing facility that will be a key component of KU’s Central District Plan.


By Peter Fabris, Contributing Editor | May 19, 2015
KU Jayhawks take a gander at a P3 development

The west entrance of the main campus of the University of Kansas with the Chi Omega Fountain. Photo: Quasselkasper via Wikimedia Commons

This article first appeared in the May 2015 issue of BD+C.

The P3 (public–private partnership) concept is getting a tryout at the University of Kansas, where state funding for construction has fallen from 20% of project costs to about 11% over the last 10 years, according to James Modig, KU’s University Architect and Director of Design and Construction Management.

Despite those cutbacks, the university has $352 million worth of building projects in design or under construction this year, up from $100–150 million annually in recent years, says Modig.

Kansas is in the RFP stage of its first P3 project, a new “gateway” housing facility that will be a key component of KU’s Central District Plan, the centerpiece of its 2014–2024 Campus Master Plan.

In addition to providing capital funds, the owner will maintain the building during the projected 30-year lease. With a $300 million maintenance backlog and an annual maintenance budget of only $9.4 million, having a developer assume maintenance costs will be a welcome innovation, says Modig.

Learn more about P3 and other creative project financing strategies in BD+C's Special Report, “How your firm can help struggling colleges and universities meet their building project goals.”

Related Stories

Game Changers | Jan 12, 2018

‘Kit of parts’ anchors university’s remake

Sasaki designs interchangeable spaces to support a major educational shift at Mexico’s largest university system.

Education Facilities | Jan 8, 2018

Three former school buildings are repurposed to create mini-campus for teacher education

The $25.3 million project is currently under construction on the Winona State University campus.

Healthcare Facilities | Jan 6, 2018

A new precision dental center embodies Columbia University’s latest direction for oral medicine education

The facility, which nests at “the core” of the university’s Medical Center, relies heavily on technology and big data. 

Big Data | Jan 5, 2018

In the age of data-driven design, has POE’s time finally come?

At a time when research- and data-based methods are playing a larger role in architecture, there remains a surprisingly scant amount of post-occupancy research. But that’s starting to change.

Mixed-Use | Jan 5, 2018

USC Village is the largest development in the history of the University of Southern California

USC Village comprises six buildings and 1.25 million sf.

Adaptive Reuse | Jan 4, 2018

Student housing development on Chapman University campus includes adaptive reuse of 1918 packing house

The Packing House was originally built for the Santiago Orange Growers Association.

University Buildings | Dec 20, 2017

New residence hall to house 500 students at Duke University

The project was designed by William Rawn Architects and will be built by Skanska.

University Buildings | Dec 4, 2017

The University of Nebraska’s new College of Business building highlights entrepreneur alumni and corporate leaders

Numerous storytelling spaces and displays are located throughout the building.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021