flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Large photovoltaic “wings” help eliminate emissions from this Italian headquarters building

Office Buildings

Large photovoltaic “wings” help eliminate emissions from this Italian headquarters building

The wings have a surface area of over 1,100 sm.


By David Malone, Associate Editor | February 19, 2018
Exterior of the Photovoltaic Bolt

Courtesy of Pierattelli Architetture

Arval, a long-term car rental company based in Italy, has recently received a new zero impact headquarters building on the outskirts of Florence. The Pierattelli Architetture-designed building, dubbed the “Photovoltaic Bolt” thanks to its arrow-like shape and large photovoltaic “wings,” is a Climate House Class A building without emissions and is self-sufficient thanks to geothermal pumps and a large array of photovoltaic panels.

The photovoltaic wings have a surface area of over 1,100 sm and comprise about 1000 panels. The flexible, high-efficiency panels are attached to a lightweight steel structure and are integrated with additional panels located on the roof. The bigger wing leans on the main entrance and has a dimension of 50 meters by 35 meters by 36 meters.

 

One of the photovoltaic wingsCourtesy of Pierattelli Architetture.

 

The smaller wing leans on the back elevation and measures 23 meters by 33 meters by 40 meters. The panels attached to the wings and the ones on the roof generate enough power to activate the geothermal pumps in the subsoil and make the building completely self-sufficient.

 

Underneath one of the photovoltaic wingsCourtesy of Pierattelli Architetture.

 

The buildings 7,000 sm of offices and common spaces are distributed over three floors and a basement. Each floor hosts about 200 employees. The spaces are articulated around a central dorsal on north-south axis to provide an east-west direction and guarantee a correct sunlight positioning.

Inside, a main hallway with a large glass wall across two of the floors fills the volume with natural light. Office floors are distinguished by colors so they can be easily identified by their function. The ground floor is ochre yellow for bureaucracy, the first floor is cobalt blue for managers and administrations, and the second floor is light green for the call center and learning center. The basement, meanwhile, hosts the technical spaces for energy control and a large break area made in a light brown color.

 

The break area located in the basement of the Arval headquarters buildingCourtesy of Pierattelli Architetture.

 

The Photovoltaic Bolt is one of the first directional buildings in Italy with zero environmental impact.

 

Office space in the new Arval headquartersCourtesy of Pierattelli Architetture.

 

The naturally-lit main hallwayCourtesy of Pierattelli Architetture.

Related Stories

Office Buildings | Apr 8, 2019

It’s time for office amenities to get to work

Amenities with the greatest impact on effectiveness and experience are those that directly support the work needs of individual employees and their teams. 

Office Buildings | Apr 8, 2019

Denver office building features 13,000 sf green roof

Dynia Architects designed the building.

Office Buildings | Apr 5, 2019

2019 trends in the workplace

From retention and career advancement to the ethics of inclusion and diversity, these five trends will play a major role this year in design, strategic planning and workplace development.

Industrial Facilities | Mar 10, 2019

The burgeoning Port San Antonio lays out growth plans

Expansions would accommodate cybersecurity, aerospace, and defense tenants, and help commercialize technologies.

Office Buildings | Mar 6, 2019

How to leverage design and culture’s two-way relationship for better workplaces

The relationship between workplace design and company culture isn’t all that different from a tango.

Office Buildings | Feb 15, 2019

A healthier perspective: Office developers bet on wellness amenities to attract top-notch tenants

Owners and developers are driving demand for wellness features and practices—active stairways, biophilia, enhanced air quality, etc.—as one more way draw tenants. 

Office Buildings | Feb 15, 2019

Vancouver’s new office building will be a stack of reflective boxes

OSO and Merrick Architecture designed the building.

Office Buildings | Feb 11, 2019

Real-world wellness pays off

3form, a materials manufacturer, did a top-to-bottom remodel of its Salt Lake City headquarters campus that included adding a 14,500-sf gym.

Office Buildings | Feb 5, 2019

Duluth Trading Company moves to new HQ building

Plunkett Raysich Architects designed the project.

boombox1
boombox2
native1

More In Category



Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.


MFPRO+ News

San Francisco unveils guidelines to streamline office-to-residential conversions

The San Francisco Department of Building Inspection announced a series of new building code guidelines clarifying adaptive reuse code provisions and exceptions for converting office-to-residential buildings. Developed in response to the Commercial to Residential Adaptive Reuse program established in July 2023, the guidelines aim to increase the viability of converting underutilized office buildings into housing by reducing regulatory barriers in specific zoning districts downtown. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021