Casino Del Sol and the Pascua Yaqui Tribe in Tucson, Ariz., recently celebrated the completion and grand opening of a $130 million, 161,000-sf hotel, spa and convention center addition to their existing casino facility.
The expansion, which began construction 18 months ago, adds 215 new luxury hotel rooms, along with a conference center that can accommodate up to 2,000 people. The addition also brings a new fine-dining steakhouse that can accommodate up to 100, an international buffet with seating up to 250, an elaborate lobby lounge and bar, a full spa and outdoor pool with sundeck, exercise facilities, a warehouse and a four-level covered parking structure for 1,100 vehicles.
The design and construction team, comprised of international architecture and engineering firm LEO A DALY, contractor McCarthy Building Companies, Inc. and owner’s representative Innovation Project Development (IPD), partnered with the casino’s executive management team and Pascua Yaqui Tribal Council members to create an amenity-rich, Four-Diamond property that creates a destination center for tourists, corporate meetings and conventions, and Tucson-area residents. BD+C
Related Stories
| May 25, 2011
Low Impact Development: Managing Stormwater Runoff
Earn 1.0 AIA/CES HSW/SD learning units by studying this article and successfully passing the online exam.
| May 25, 2011
Register today for BD+C’s June 8th webinar on restoration and reconstruction projects
Based on new and award-winning building projects, this webinar presents our “expert faculty” to examine the key issues affecting project owners, designers and contractors in case studies ranging from gut renovations and adaptive reuses to restorations and retrofits.
| May 25, 2011
Hotel offers water beds on a grand scale
A semi-submerged resort hotel is the newest project from Giancarlo Zema, a Rome-based architect known for his organic maritime designs. The hotel spans one kilometer and has both land and sea portions.
| May 25, 2011
Smithsonian building $45 million green lab
Thanks to a $45 million federal appropriation to the Smithsonian Institution, the Smithsonian Environmental Research Center in Edgewater, Md., has broken ground on what is expected to be one of the most energy-efficient laboratories in the country. The 69,000-sf lab is targeting LEED Gold and is expected to use 37% less energy and emit 37% less carbon dioxide than a similar building.
| May 25, 2011
World’s tallest building now available in smaller size
Emaar Properties teamed up with LEGO to create a miniature version of the Burj Khalifa as part of the LEGO Architecture series. Currently, the LEGO Burj Khalifa is available only in Dubai, but come June 1, 2011, it will be available worldwide.