LEO A DALY has tapped Kimberly Cowman, a 17-year company veteran, to be its first National Director of Engineering, which will become effective sometime after January 1, 2020.
The 38-year-old Cowman, PE, LEED AP, HFDP, and Senior Associate, will report to John Kraskiewicz, AIA, the firm’s Senior Vice President and COO. She is meeting this week with the company’s brand leadership to discuss her staffing needs, as well as plans for restructuring LEO A DALY’S engineering services with an eye toward growing that practice.
In an interview this morning with BD+C, Cowman said she was “excited and nervous” about embarking on this “new adventure” in a career that is distinguished by her management of myriad healthcare projects. These include, most recently, multiple pharmacy UPS compliance renovations for CHI Health in Nebraska and Iowa, and a $13 million 34,000-sf addition/renovation to Phelps Memorial Health Center in Holdrege, Neb.
Cowman sees her new job as more of a “brand position,” where she’ll be working closely with all of the firm’s design studios and their brand leaders on strategy. She sees herself as an “advocate for engineering” across geographies and market sectors, and for Integrated Project Delivery “which LEO A DALY does really well.”
“One of the primary reasons I enjoy working at LEO A DALY, and have remained here for 17 years, is my commitment to our full-service integrated design practice,” she says.
IPD is “key to creating sustainable, high-performance buildings that deliver the most value to our clients,” says Steve Lichtenberger, LEO A DALY’S President. “Kim’s strategic vision for growing our engineering practice, her deep understanding of our design culture, and her passion for innovation make her the perfect choice to lead engineering for the firm.”
At a time when AEC firms are trying to attract more women to their ranks and corporate suites, Cowman has actively participated in recruiting and hiring engineers for the firm’s Omaha office, and has worked to develop new engineering positions—such as High-Performance Building Engineer—that enhance the practice. Cowman has also demonstrated thought leadership through publishing and speaking engagements.
Cowman is a graduate of the University of Nebraska, from which she earned a Masters in Architectural Engineering. She’s a mother of two boys, six and two, and her husband is a cartographer for the U.S. Army Corps of Engineers.
Related Stories
| Feb 23, 2011
Call for Entries: 2011 Building Team Awards, Deadline: March 25, 2011
The 14th Annual Building Team Awards recognizes newly built projects that exhibit architectural and construction excellence—and best exemplify the collaboration of the Building Team, including the owner, architect, engineer, and contractor.
| Feb 23, 2011
Green building on the chopping block in House spending measure
Bryan Howard, Legislative Director of the U.S. Green Building Council, blogs about proposed GOP budget cuts that could impact green building in the commercial sector.
| Feb 22, 2011
LEED Volume Program celebrates its 500th certified Pilot Project
More than 500 building projects have certified through the LEED Volume Program since the pilot launched in 2006, according to the U.S. Green Building Council. The LEED Volume Program streamlines the certification process for high-volume property owners and managers, from commercial real estate firms, national retailers and hospitality providers, to local, state and federal governments.
| Feb 14, 2011
Sustainable Roofing: A Whole-Building Approach
According to sustainability experts, the first step toward designing an energy-efficient roofing system is to see roof materials and systems as an integral component of the enclosure and the building as a whole. Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.
| Feb 11, 2011
Four Products That Stand Up to Hurricanes
What do a panelized wall system, a newly developed roof hatch, spray polyurethane foam, and a custom-made curtain wall have in common? They’ve been extensively researched and tested for their ability to take abuse from the likes of Hurricane Katrina.
| Feb 11, 2011
RS Means Cost Comparison Chart: Office Buildings
This month's RS Means Cost Comparison Chart focuses on office building construction.
| Feb 11, 2011
Sustainable features on the bill for dual-building performing arts center at Soka University of America
The $73 million Soka University of America’s new performing arts center and academic complex recently opened on the school’s Aliso Viejo, Calif., campus. McCarthy Building Companies and Zimmer Gunsul Frasca Architects collaborated on the two-building project. One is a three-story, 47,836-sf facility with a grand reception lobby, a 1,200-seat auditorium, and supports spaces. The other is a four-story, 48,974-sf facility with 11 classrooms, 29 faculty offices, a 150-seat black box theater, rehearsal/dance studio, and support spaces. The project, which has a green roof, solar panels, operable windows, and sun-shading devices, is going for LEED Silver.