flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Loews Hotels & Resorts announces major cross-portfolio upgrades

Loews Hotels & Resorts announces major cross-portfolio upgrades

Plan will improve 15 of the company's 19 properties, focusing on public spaces and connectivity.


By Loews Hotels & Resorts | September 13, 2013
Loews Coronado Bay Resort, San Diego, recently completed a nine-month transforma
Loews Coronado Bay Resort, San Diego, recently completed a nine-month transformation that included a complete redesign of its lobby, Bay Terrace, Cays Lounge, Market Caf, and Market-to-Go.

Loews Hotels & Resorts is currently in the midst of a major growth and property redesign initiative, reflecting a strong national trend in hospitality renovation. The project touches 15 of the company's 19 properties, including 10 property renovations, three hotel acquisitions, and two new builds, ranging from updates to the building facades and the hotel lobbies, to new color palettes and renovated bathrooms.
 
With the redesign, Loews Hotels & Resorts puts an emphasis on repositioning the lobby and public spaces as areas for gathering and connectivity. Loews approached this goal by installing media walls with LCD flat screen TVs, increasing WiFi access and making electrical outlets more abundant and accessible. The design upgrades will also allow for more live entertainment and activity, which will encourage hotel guests and locals alike to utilize the public spaces for social interaction.
 
Beyond this common vision for more connectivity, each property takes a completely unique design approach. All the venues in the Loews portfolio have their own story, history and local character so there are no repeated design ideas from one property to the next.
 
Renovation highlights include top to bottom upgrades at the newly acquired Loews Hollywood Hotel, the extensive overhaul of Portofino Bay’s 750 rooms and suites, and the first ever, full renovation of the flagship location, Loews Regency Hotel, which is set to reopen early 2014. Below is a complete timeline and overview of the various renovations. 

Renovation Timeline

Loews Annapolis Hotel completed an extensive renovation of its lobby and restaurant in August of 2012.

Loews Coronado Bay Resort completed a nine-month long transformation that included a complete redesign of its lobby, Bay Terrace, Cays Lounge, Market Café and Market-to-Go in January of 2013.

Loews Philadelphia Hotel completed a three-month long guestroom renovation in April of 2013. The hotel will undergo a total transformation of its lobby, entrance and restaurant/bar area in the coming year.

Loews Portofino Bay Hotel completed an immense renovation project that refreshed all 750 rooms and suites with a new Mediterranean-inspired design that enhances the overall guest experience in April of 2013.

Loews Santa Monica Beach Hotel completed a façade renovation in April of 2013 and will finish renovation of a series of rooms adjacent to the pool to create premium poolside cabana rooms, as well as a series of beach-level rooms that will feature residential-style patios, complete with fire pits later this year.

Loews Vanderbilt Hotel completed an extensive renovation including a complete redesign of the lobby, remodeled corridors, new guest and public bathrooms, and the new Mason’s restaurant and Mason Bar in May of 2013.

Loews Hôtel Vogue – completed a property renovation including redesigned guest rooms, an updated lobby, exterior façade and the addition of the renowned La Société Bistro from Toronto, in June of 2013.

Loews Hollywood Hotel acquired the historic Hollywood Hotel, home to the former Kodak Theater, now the Dolby Theater, a major partner of the annual Academy Awards ceremony completed in the summer of 2012. Hotel is currently undergoing a renovation of all guestrooms, the lobby, lobby bar, restaurant and meeting spaces, scheduled for completion in November of 2013.

Loews Regency Hotel – undergoing its first-ever full renovation in its 50-year history. The redesign will maintain the traditional elements that helped shape the hotel as a New York Institution, but will be complemented by new modern touches that will still uphold the overall Loews Regency legacy. The hotel is set to re-open in January of 2014.

Loews Boston Back Bay Hotel acquired the 225-room Back Bay Hotel in Boston in February of 2013 and renovations are scheduled to begin in the fall of this year finished in April of 2014

Related Stories

Architects | Jun 22, 2023

Keith Hempel named President of LPA Design Studios

LPA Design Studios today announced the promotion of Chief Design Officer Keith Hempel, FAIA, to president of the 58-year-old integrated design firm. Hempel, who joined LPA in 1995, has been an integral part of the firm’s growth, helping to develop an integrated design process that has produced industry-leading results. 

Industrial Facilities | Jun 20, 2023

A new study presses for measuring embodied carbon in industrial buildings

The embodied carbon (EC) intensity in core and shell industrial buildings in the U.S. averages 23.0 kilograms per sf, according to a recent analysis of 26 whole building life-cycle assessments. That means a 300,000-sf warehouse would emit 6,890 megatons of carbon over its lifespan, or the equivalent of the carbon emitted by 1,530 gas-powered cars driven for one year. Those sobering estimates come from a new benchmark study, “Embodied Carbon U.S. Industrial Real Estate.”

Virtual Reality | Jun 16, 2023

Can a VR-enabled AEC Firm transform building projects?

With the aid of virtual reality and 3D visualization technologies, designers, consultants, and their clients can envision a place as though the project were in a later stage.

Mechanical Systems | Jun 16, 2023

Cogeneration: An efficient, reliable, sustainable alternative to traditional power generation

Cogeneration is more efficient than traditional power generation, reduces carbon emissions, has high returns on the initial investment, improves reliability, and offers a platform for additional renewable resources and energy storage for a facility. But what is cogeneration? And is it suitable for all facilities?

Office Buildings | Jun 15, 2023

An office building near DFW Airport is now home to two Alphabet companies

A five-minute drive from the Dallas-Fort Worth International Airport, the recently built 2999 Olympus is now home to two Alphabet companies: Verily, a life sciences business, and Wing, a drone delivery company. Verily and Wing occupy the top floor (32,000 sf and 4,000 sf, respectively) of the 10-story building, located in the lakeside, work-life-play development of Cypress Waters.

Transit Facilities | Jun 15, 2023

Arlington, Va., transit station will support zero emissions bus fleet

Arlington (Va.) Transit’s new operations and maintenance facility will support a transition of their current bus fleet to Zero Emissions Buses (ZEBs). The facility will reflect a modern industrial design with operational layouts to embrace a functional aesthetic. Intuitive entry points and wayfinding will include biophilic accents.

Urban Planning | Jun 15, 2023

Arizona limits housing projects in Phoenix area over groundwater supply concerns

Arizona will no longer grant certifications for new residential developments in Phoenix, it’s largest city, due to concerns over groundwater supply. The announcement indicates that the Phoenix area, currently the nation’s fastest-growing region in terms of population growth, will not be able to sustain its rapid growth because of limited freshwater resources. 

Multifamily Housing | Jun 15, 2023

Alliance of Pittsburgh building owners slashes carbon emissions by 45%

The Pittsburgh 2030 District, an alliance of property owners in the Pittsburgh area, says that it has reduced carbon emissions by 44.8% below baseline. Begun in 2012 under the guidance of the Green Building Alliance (GBA), the Pittsburgh 2030 District encompasses more than 86 million sf of space within 556 buildings. 

Industry Research | Jun 15, 2023

Exurbs and emerging suburbs having fastest population growth, says Cushman & Wakefield

Recently released county and metro-level population growth data by the U.S. Census Bureau shows that the fastest growing areas are found in exurbs and emerging suburbs. 

Healthcare Facilities | Jun 14, 2023

Design considerations for behavioral health patients

The surrounding environment plays a huge role in the mental state of the occupants of a space, especially behavioral health patients whose perception of safety can be heightened. When patients do not feel comfortable in a space, the relationships between patients and therapists are negatively affected.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021