The Los Angeles Department of Building and Safety recently launched the Fast-Track Office Tenant Improvements Program.
The effort is a response to the COVID-19 pandemic and the resulting market demand “to reconfigure, retrofit, and/or reprogram existing workplaces, retail sites, and commercial office buildings for healthy, safer, and more equitable interior spaces,” according to a news release. The department offers its E-Plan portal to help fast-track the permitting and approval process for tenant improvement projects.
The department developed the plan after gathering input from local architects and building owners and managers. “This program serves residents, visitors, and those whose livelihoods depend on safe and rapid re-opening of commercial spaces,” said Wade Killefer, FAIA, president, AIA Los Angeles. “Fast-tracking these improvements means important and necessary adjustments can be benefited from more rapidly.”
The program is available to all licensed architects and engineers who wish to participate. Projects are limited in scope to basic tenant improvements or office fit-outs only.
Related Stories
| May 3, 2012
Green-roof requirement now includes industrial facilities in Toronto
A mandate that requires installation of green roofs on new commercial and residential buildings in Toronto has been expanded to include industrial facilities.
| May 3, 2012
Innovative wastewater treatment helps achieve LEED rating
LEED for New Construction, Neighborhood Development and the LEED Volume Program offer some ways to achieve LEED points when dealing with wastewater treatment.
| Apr 26, 2012
Lack of bolts on steel support caused collapse at Cincinnati casino
Too few bolts connecting horizontal steel support beams with vertical steel columns was the cause of January’s construction accident at Horseshoe Casino Cincinnati, according to the report of the Occupational Safety and Health Administration.
| Apr 26, 2012
OSHA criticized for taking too long to roll out safety rules
The Occupational Safety and Health Administration takes far too long to adopt new safety regulations compared to other agencies’ development of rules, safety experts said during a Senate hearing.
| Apr 26, 2012
Contractors fear that GSA scandal will lead to fewer federal construction contracts
In the wake of the recent scandal at the General Services Administration in which workers spent lavishly at a Las Vegas conference, a spokesman for Associated General Contractors of America said contractors are worried the scandal will result in cuts to GSA's construction and renovation budgets.
| Apr 26, 2012
Developers can use LEED wastewater credits to help gain approvals in environmentally sensitive locales
Those wanting to pursue development in heavily regulated and environmentally sensitive areas are benefiting by designing projects that qualify for LEED points, even if the project as a whole does not achieve certification.
| Apr 26, 2012
New York City Council moves to license elevator mechanics
New York’s City Council introduced a measure last week that would require the city’s 7,000 elevator mechanics to meet national standards and be licensed by the city.
| Apr 23, 2012
AAMA releases updated specification for anodized aluminum
AAMA 611-12 describes test procedures and requirements for high performance (Class I) and commercial (Class II) architectural quality aluminum oxide coatings applied to aluminum extrusions and panels for architectural products.