flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Los Angeles launches fast-track office tenant improvements program

Codes and Standards

Los Angeles launches fast-track office tenant improvements program

Red tape to be cut to make interiors healthier and safer.


By Peter Fabris, Contributing Editor | November 10, 2021
Los Angeles skyline

Courtesy Pixabay

The Los Angeles Department of Building and Safety recently launched the Fast-Track Office Tenant Improvements Program.

The effort is a response to the COVID-19 pandemic and the resulting market demand “to reconfigure, retrofit, and/or reprogram existing workplaces, retail sites, and commercial office buildings for healthy, safer, and more equitable interior spaces,” according to a news release. The department offers its E-Plan portal to help fast-track the permitting and approval process for tenant improvement projects.

The department developed the plan after gathering input from local architects and building owners and managers. “This program serves residents, visitors, and those whose livelihoods depend on safe and rapid re-opening of commercial spaces,” said Wade Killefer, FAIA, president, AIA Los Angeles. “Fast-tracking these improvements means important and necessary adjustments can be benefited from more rapidly.”

The program is available to all licensed architects and engineers who wish to participate. Projects are limited in scope to basic tenant improvements or office fit-outs only.

Related Stories

Codes and Standards | Mar 4, 2021

Biden administration overturns Trump’s federal building design mandate

Previous order promoted classical and “traditional” architecture above others.

Codes and Standards | Mar 3, 2021

Texas freeze raises questions about risks of electrifying buildings

Gas stoves helped residents cook, boil water when power went out.

Codes and Standards | Mar 2, 2021

New Seattle building code eliminates fossil fuels for most space and water heating

Also increases on-site solar photovoltaics, reduces envelope heat loss, air leakage, and interior lighting power allowances.

Codes and Standards | Feb 25, 2021

It’s not just lumber—roofing material prices are also on the rise

Lower demand for petroleum products means less asphalt production.

Codes and Standards | Feb 23, 2021

ASHRAE Epidemic Task Force releases updated Building Readiness Guide

Includes flush calculations to reduce time and energy to clear contaminants between occupancy periods.

Codes and Standards | Feb 22, 2021

Preservation of Affordable Housing develops climate resilience strategy

Includes backup power for resident and staff “area of refuge”.

Codes and Standards | Feb 18, 2021

Construction industry moves toward comprehensive U.S. BIM standard

NIBS hosts roundtable to create coordinated program to advance collaboration.

Codes and Standards | Feb 17, 2021

Construction on international sports venues is ripe for corruption

Poor planning, complex contracting, a lack of accountability and high levels of collusion to blame.

Codes and Standards | Feb 16, 2021

Feds may fund removal of some urban highways

Senate bill proposes pilot program to reknit communities.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021