flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Luxury hotel 'groundscraper' planned in abandoned quarry

Luxury hotel 'groundscraper' planned in abandoned quarry

Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.


By By Raemin Zhang, cnngo.com | April 3, 2012
InterContinental Shimao Shanghai Wonderland is expected to extend 19 stories int
InterContinental Shimao Shanghai Wonderland is expected to extend 19 stories into the bottom of the pit. It's due to open in lat

For more than a decade, China has been a front-runner in the world’s skyscraper race. Now the country is taking the pole position in digging “groundscrapers” -- enormous structures built mostly underground.

Most recently, ground has been broken on construction of a high-end hotel at the foot of Shanghai’s Tianmashan in a 100-meter-deep pit.

Developed by Shanghai Shimao Property Group and to be managed by InterContinental Hotels Group, the hotel, named InterContinental Shimao Shanghai Wonderland, is expected to extend 19 stories into the bottom of the pit. It's due to open in late 2014 or early 2015.

Once completed, the deepest story of the luxury resort will be approximately 700 meters lower than the top floor of the world’s-highest-hotel-to-be, the Shanghai Tower J Hotel in Shanghai Tower, set for completion around the same time.  Located about 45 kilometers southwest of Shanghai's city center, the pit in Tianmashan is 100 meters deep, 240 meters long and 160 meters wide. The lowest 20 meters are filled with stagnant rainwater, which the hotel will retain.

“The pit has served as a quarry since the 1950s,” said Yao Qi senior branding manager of Shanghai Shimao Property Group. "It has been abandoned since the year 2000."

Shimao purchased the surrounding land in 2006 in order to build Shimao Shanghai Wonderland, a large-scale theme park integrating hospitality, leisure and entertainment elements. The hotel is planned as part of the wonderland complex. Construction of the 380-room InterContinental Shimao Shanghai Wonderland commenced last month. The 19-story hotel will have three levels above ground, and 16 underground, including an underwater restaurant.

“A 60-meter glass curtain will be built to mimic a waterfall next to the resort’s main structure,” said Yao.

Designed by UK-based engineering firm Atkins, the company behind the ostentatious Burj Al Arab hotel in Dubai, the quarry hotel design bagged a Gold Medal at last year's commercial real estate MIPIM Asia Awards.

Hotel planners are considering taking advantage of the site's surrounding cliffs by hosting activities such as rock climbing and bungee jumping. Industry experts believe nightly room rates will start from RMB 2,000 (US$320), twice the price currently charged by nearby five-star hotels. Shimao is investing a total of RMB 3.5 billion (US$555 million) in the 428,200-square-meter Shimao Shanghai Wonderland, of which RMB 600 million (US$95 million) will go toward the subterranean resort.

The Shanghai property group has yet to reveal detailed plans for the rest of the wonderland complex. BD+C

Related Stories

| Oct 27, 2011

ASSA Abloy, MAXXESS Systems announce U.S. Aperio integration

Aperio will integrate with MAXXESS's eAXxess  and Efusion Event Management Software packages.

| Oct 26, 2011

Metl-Span selected for re-roof project

School remained in session during the renovation and it was important to minimize the disruption as much as possible.

| Oct 26, 2011

Shawmut Design and Construction awarded Tag Heuer build in Aventura, Fla.

New store features 1,200 sf fit out at Aventura Mall.

| Oct 25, 2011

HKS Science & Technology practice formed

Specializing in the planning and design of highly technical building types, HKS’s Science & Technology practice offers the broadest range of services available to the academic and biomedical research, biotechnology, pharmaceutical and medical device community, including laboratory programming, planning and design, strategic science planning and laboratory equipment planning.

| Oct 25, 2011

Universal teams up with Earthbound Corp. to provide streamlined commercial framing solutions

The primary market for the Intact Structural Frame is light commercial buildings that are typically designed with concrete masonry walls, steel joists and steel decks.

| Oct 25, 2011

Ritner Steel CEO elected to AISC Board

Freund will begin serving on the AISC board of directors, assisting with the organization's planning and leadership in the steel construction industry.

| Oct 25, 2011

Commitment to green building practices pays off

The study, conducted by the Pacific Northwest National Laboratory, built on a good indication of the potential for increased productivity and performance pilot research completed two years ago, with similarly impressive results.

| Oct 25, 2011

DOE issues report on financing solar photovoltaic systems for K-12 schools

The report examines the two primary types of ownership models used to obtain solar installations. This analysis can help school administrators across the country select the best option for deploying solar technologies in their school districts.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021