flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

McGuire Engineers welcomes VP and Partner David P. Callan

McGuire Engineers welcomes VP and Partner David P. Callan

Callan to lead McGuire Engineers' High Performance Building's Practice


By McGuire Engineers | May 15, 2013

McGuire Engineers is pleased to announce that David P. Callan, PE, CEM, LEED AP, HBDP has joined the firm as vice president and partner. With over 17 years of experience, Callan leads the firm’s high performance buildings practice.

“David’s expertise in the design and analysis of building systems for high performance projects in the commercial, institutional, healthcare, mission critical, public, and federal markets is a tremendous asset to the company,” said Anthony McGuire, founder and principal of McGuire Engineers.

Prior to joining McGuire Engineers, Callan served as senior vice president and director of technical operations for Environmental Systems Design, Inc. located in Chicago, Ill. His career also includes senior positions at Syska Hennessy Group, Inc and Skidmore, Owings & Merrill LLP. Callan received a B.S. in Architectural Engineering from Drexel University and a M.S. in Construction Engineering and Management from the Illinois Institute of Technology. 

About McGuire Engineers
McGuire Engineers, Inc., (MEPC) founded in 1986, is a full service engineering firm based in Chicago, Ill. which provides engineering design and consulting services for both existing and new commercial, institutional and industrial buildings. MEPC is active in LEED-Certified and sustainable design projects and has LEED accredited professionals in every discipline with excellent performance records in LEED design, commissioning, energy modeling, energy audits and consulting. MEPC clients have trusted the firm with their finest art and most valuable assets, and the staff prides itself on developing innovative solutions that not only do the job, but save customers time and money.  Notable projects include the John Hancock Building, The Field Museum and the Art Institute of Chicago.  Visit www.mepcinc.com.

Related Stories

| Aug 30, 2013

Modular classrooms gaining strength with school boards

With budget, space needs, and speed-to-market pressures bearing down on school districts, modular classroom assemblies are often a go-to solution.

| Aug 30, 2013

Local Government Report [2013 Giants 300 Report]

Building Design+Construction's rankings of the nation's largest local government design and construction firms, as reported in the 2013 Giants 300 Report.  

| Aug 30, 2013

A new approach to post-occupancy evaluations

As a growing number of healthcare institutions become more customer-focused, post-occupancy evaluations (POE) are playing a bigger role in new construction and renovation projects. Advocate Health Care is among the healthcare organizations to institute a detailed post-occupancy assessment process for its projects. 

| Aug 30, 2013

State Government Report [2013 Giants 300 Report]

Stantec, Jacobs, PCL Construction among nation's top state government design and construction firms, according to BD+C's 2013 Giants 300 Report.

| Aug 29, 2013

Is it possible to build a LEED Gold prison?

Why yes, of course it is. Correctional design exerts from Shive-Hattery and the Iowa Department of Corrections will demonstrate how at the upcoming BUILDINGChicago conference and expo, September 9-11 at the Holiday Inn Chicago Mart Plaza.  

| Aug 29, 2013

First look: K-State's Bill Snyder Family Stadium expansion

The West Side Stadium Expansion Project at Kansas State's Bill Snyder Family Stadium is the largest project in K-State Athletics history. 

Sponsored | | Aug 29, 2013

Nichiha USA panels selected for unique mixed-use project in Cambridge, Mass.

Peter Quinn Architects specifies Nichiha’s Illumination Series Panels for a progressive look for a work/live/play development in the heart of the Harvard community.

| Aug 28, 2013

Focusing on the total client experience

Although firms commonly use client satisfaction surveys and interviews to assess how well their teams are performing, a new article from Harvard Business Review suggests these tools might not provide an accurate picture of the total client experience. 

| Aug 28, 2013

Standards for BIM improve reliability of data downstream, but what does this mean for us today?

I’m encouraged to see progress being made to make BIM more useable and reliable downstream. These are all good steps in the right direction, but how can we leverage this additional clarity today? Does it require us to have all stakeholders and team members in the model to collaborate and share information? It appears as if this is the ultimate goal.

| Aug 28, 2013

Building owners to speak out at BUILDINGChicago conference and expo

Real estate professionals from Crate and Barrel, Jones Lang LaSalle, Baxter, Siemens, and Advocate Healthcare are among the building owner representatives that will be attending and speaking at BD+C's new conference and expo, BUILDINGChicago, September 9-11. 

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021