In response to the surge in population growth in the Greater Phoenix Area, a new multifamily development is now under construction in Gilbert, Ariz.
Springs at Cooley Station will feature 276 apartment units spread across 14 acres and 10 garden-style buildings. The wood-frame buildings will rise two and three stories and feature a stucco and brick exterior.
See Also: COVID-19: How are you doing?
Interiors will include high-end finishes such as granite countertops and stainless steel appliances in the kitchen. Amenities include a clubhouse with a fitness center and an outdoor swimming pool. The development will also include 490 parking spaces.
The build team includes Phillips Partnership as the architect of record and McShane Construction as the general contractor. The project is slated for completion in early 2022.
Related Stories
| Jul 20, 2012
2012 Giants 300 Special Report
Ranking the leading firms in Architecture, Engineering, and Construction.
| Jul 19, 2012
Rental market pushing service, ‘community’
The Top 25 Giants 300 AEC firms in the Multifamily Sector keep four-legged tenants in mind.
| Jul 9, 2012
Modular Construction Delivers Model for New York Housing in Record Time
A 65-unit supportive housing facility in Brooklyn, N.Y., was completed in record time using modular construction with six stories set in just 12 days.
| Jul 9, 2012
Oakdale, Calif., Heritage Oaks Senior Apartments opens
New complex highlights senior preferences for amenities.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 31, 2012
2011 Reconstruction Awards Profile: Ka Makani Community Center
An abandoned historic structure gains a new life as the focal point of a legendary military district in Hawaii.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 2, 2012
Building Team completes two additions at UCLA
New student housing buildings are part of UCLA’s Northwest Campus Student Housing In-Fill Project.