flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mexico’s ‘premier private academic health center’ under design

Healthcare Facilities

Mexico’s ‘premier private academic health center’ under design

One of the country’s biggest construction projects planned for Monterrey


By Peter Fabris, Contributing Editor | April 16, 2024
Mexico’s TecSalud Health Sciences Campus is under design
Rendering courtesy The Beck Group

The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.

One of Mexico’s biggest construction projects, TecSalud will include two buildings covering 322,900 sf. The structures will house more than 30 classrooms and 12 laboratories. Plans also call for new simulation labs for the medical education program. The design will include flexible spaces that can be quickly adapted to differing needs of the healthcare industry.

Positioning the medical school near the Zambrano Hellion Hospital, which will be expanded, and new research facilities, will play a vital role in positioning the campus as a leader in healthcare education and delivery. It will further elevate Tec de Monterrey’s reputation as one of the world’s leading academic centers, according to The Beck Group. Three distinct groups—students, doctors, and researchers—will work within the same environment to tackle shared challenges and devise solutions.

Design is underway, and construction will begin next year. Completion is targeted for the summer of 2027.

Beck previously designed multiple projects at the Monterrey campus, including the Wellness Center and Banorte Stadium. The firm also designed and built the university’s academic buildings and library at the Mexico City campus.

Owner and/or developer: Tecnológico de Monterrey
Design architect: The Beck Group
Architect of record: The Beck Group
MEP engineer: Not yet selected
Structural engineer: Not yet selected 
General contractor/construction manager: The Beck Group

Related Stories

| May 16, 2012

Balfour Beatty Construction taps Kiger as VP of operations

Kiger will manage current relationships and pursue other strategic clients, including select healthcare clients and strategic project pursuits in the Central Tennessee region.

| May 7, 2012

4 more trends in higher-education facilities

Our series on college buildings continues with a look at new classroom designs, flexible space, collaboration areas, and the evolving role of the university library.

| May 7, 2012

2012 BUILDING TEAM AWARDS: Fort Belvoir Community Hospital

A new military hospital invokes evidence-based design to create a LEED-certified facility for the nation’s soldiers and their families.

| May 7, 2012

2012 BUILDING TEAM AWARDS: Audie L. Murphy VA Hospital

How a Building Team created a high-tech rehabilitation center for wounded veterans of the conflicts in Iraq and Afghanistan.

| May 3, 2012

2012 BUILDING TEAM AWARDS: Rush University Medical Center

This fully integrated Building Team opted for a multi-prime contracting strategy to keep construction going on Chicago’s Rush University Medical Center, despite the economic meltdown.

| May 3, 2012

Ground broken for $94 million hospital expansion at Scripps Encinitas

New facility to more than double emergency department size, boost inpatient beds by 43%.

| May 1, 2012

Construction is underway on MLK ambulatory care center in L.A.

Featuring a variety of sustainable features, the new facility is designed to achieve LEED Gold Certification.

| Apr 27, 2012

GreenExpo365.com to offer webinars on EPA’s WaterSense Program

Architects and builders interested in developing water-efficient buildings invited to attend free sessions featuring experts discussing water-efficient building practices.

| Apr 25, 2012

McCarthy introduces high school students to a career in construction

High school students from the ACE Mentoring Program tour the new CHOC Children’s Patient Tower in Orange, Calif.

| Apr 20, 2012

McCarthy completes Santa Barbara Cottage Hospital Replacement Facility

The new hospital’s architectural design combines traditional Santa Barbara Spanish colonial architecture with 21st century medical conveniences highlighted by a therapeutic and sustainable atmosphere.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021