flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Miami ‘innovation district’ will have 6.5 million sf of dense, walkable space

Mixed-Use

Miami ‘innovation district’ will have 6.5 million sf of dense, walkable space

Designing a neighborhood from the ground-up, developers aim to create a dense, walkable district that fulfills what is lacking from Miami’s current auto-dependent layout.


By BD+C Staff | May 5, 2015
Miami ‘Innovation District’ will have 6.5 million-sf dense, walkable space

Designers say the tower is inspired by things associated with Miami: fashion, sculpture, and sailboats. Renderings courtesy SHoP Architects

Miami developer Michael Simkins wants to create a space that will attract great talent to the city’s up-and-coming tech scene by providing amenities that, as The Next Miami puts it, “surpasses anything that currently exists in Miami.”

Hence, the developer has proposed a new mixed-used district and commissioned SHoP Architects and West 8 to design an environment with infrastructure for future growth of creative technology industries. 

Designing a neighborhood from the ground-up, developers aim to create a dense, walkable district that fulfills what is lacking from Miami’s current auto-dependent layout. The district will spread over ten acres on four blocks, and will include:

  • 3,850,000 sf office space
  • 2,400,000 sf residential space
  • 250,000 sf retail
  • 2,500 parking spaces

Renderings released by the design firm feature the Miami Innovation Tower, which the developers described in a statement as “a civic-minded icon for the digital age,” with designed inspired by things associated with Miami—“contemporary sculpture and fashion to the taught, wing-like graphics covered sails of modern racing sailboats.”

The project’s approval is expected later this year.

 

Related Stories

| Jan 15, 2012

Smith Consulting Architects designs Flower Hill Promenade expansion in Del Mar, Calif.

The $22 million expansion includes a 75,000-square-foot, two-story retail/office building and a 397-car parking structure, along with parking and circulation improvements and new landscaping throughout.

| Dec 27, 2011

Ground broken for adaptive reuse project

Located on the Garden State Parkway, the master-planned project initially includes the conversion of a 114-year-old, 365,000-square-foot, six-story warehouse building into 361 loft-style apartments, and the creation of a three-level parking facility.

| Dec 19, 2011

Chicago’s Aqua Tower wins international design award

Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.

| Dec 12, 2011

Mojo Stumer takes top honors at AIA Long Island Design Awards

Firm's TriBeCa Loft wins "Archi" for interior design.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Nov 28, 2011

Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.

Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 3, 2011

Hardin Construction tops out Orlando Embassy Suites

The project began in April 2011 and is expected to open in fall 2012.

| Sep 30, 2011

Kilbourn joins Perkins Eastman

Kilbourn joins with more than 28 years of design and planning experience for communities, buildings, and interiors in hospitality, retail/mixed-use, corporate office, and healthcare.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021