flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Miami review board recommends approval for Arquitectonica’s top-heavy condo tower

Multifamily Housing

Miami review board recommends approval for Arquitectonica’s top-heavy condo tower

The 57-story Elysee Miami will offer residents impeccable views and plenty of amenities.


By Mike Chamernik, Associate Editor | February 10, 2016
Miami review board recommends approval for luxury condo tower

Courtesy David Siddons Group.

A 57-story luxury condo tower in Miami is one step closer to being built.

This week, Miami Today reported that the city's Urban Development Review Board recommended the approval of Elysee Miami, which will hug the waterfront in the Edgewater neighborhood. 

Architect Bernardo Fort-Brescia, of the Miami firm Arquitectonica, designed its three-tier shape that gets wider as it gets taller. It will have only two units per floor (100 condos total) with 3-, 4-, and 5-bedroom layouts. Floor-to-ceiling glass windows and sliding balcony doors will provide unobstructed views of the city and the ocean. Condo prices start at $1.67 million.

The building has plenty of perks, with services including valet parking, white glove concierge service, and even robotic parking. It has two full floors of amenities: The seventh floor will have a 75-foot pool, a yoga studio, fitness center, and guest suites, and the 30th floor has a 30-guest dining room, chef’s kitchen, business center, and resident wine storage. 

Unlike many newer projects, the Elysee Miami will not have retail or restaurant space at its ground level.

Two Roads Development is the developer of the Elysee Miami, and Jean-Louis Deniot is the interior designer. It is expected to be completed in 2018.

Related Stories

Multifamily Housing | Mar 10, 2015

KTGY homes in on seniors with new studio

Its director, Doug Ahlstrom, says designs will emphasize socialization and community.

Multifamily Housing | Mar 10, 2015

Multifamily renovation now drives growth for national restoration business

Response Team 1 has established a national footprint through acquisitions. 

Retail Centers | Mar 10, 2015

Retrofit projects give dying malls new purpose

Approximately one-third of the country’s 1,200 enclosed malls are dead or dying. The good news is that a sizable portion of that building stock is being repurposed.

Architects | Mar 9, 2015

Study explores why high ceilings are popular

High ceilings give us a sense of freedom, new research finds

Transit Facilities | Mar 4, 2015

5+design looks to mountains for Chinese transport hub design

The complex, Diamond Hill, will feature sloping rooflines and a mountain-like silhouette inspired by traditional Chinese landscape paintings.

Multifamily Housing | Mar 3, 2015

10 kitchen and bath design trends for 2015

From kitchens made for pet lovers to floating vanities, the nation's top kitchen and bath designers identify what's hot for 2015.

Sponsored | Modular Building | Mar 3, 2015

Modular construction brings affordable housing to many New Yorkers

After city officials waived certain zoning and density regulations, modular microunits smaller than 400 square feet are springing up in New York.

Modular Building | Feb 23, 2015

Edge construction: The future of modular

Can innovative project delivery methods, namely modular construction, bring down costs and offer a solution for housing in urban markets? FXFOWLE’s David Wallance discusses the possibilities for modular.

Multifamily Housing | Feb 23, 2015

Millennials to outgrow Baby Boomers in 2015

The Baby Boomer generation, once the nation's largest living generation, will be outpaced by the Millennials this year, according to the Pew Research Center.

Multifamily Housing | Feb 19, 2015

Is multifamily construction getting too frothy for demand?

Contractors are pushing full speed ahead, but CoStar Group thinks a slowdown might be in order this year.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021