flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mixed-use Seattle high-rise earns LEED Gold

Mixed-use Seattle high-rise earns LEED Gold


August 11, 2010
This article first appeared in the 200911 issue of BD+C.

Seattle’s 2201 Westlake development became the city’s first mixed-use and high-rise residential project to earn LEED Gold. Located in Seattle’s South Lake Union neighborhood, the newly completed 450,000-sf complex includes 300,000 sf of Class A office space, 135 luxury condominiums (known as Enso), and 25,000 sf of retail space. The project’s green features include underfloor HVAC delivery, high-performance central energy plant, water-efficient fixtures and fittings, drought-tolerant landscaping, and extensive material/construction waste recycling and salvaging. The project was developed by Vulcan Real Estate, designed by Callison, and constructed by Sellen Construction with Glumac as MEP.

Related Stories

| Feb 17, 2020

Interior designers weigh in on outdoor kitchens

Designers weigh in on outdoor kitchens

Multifamily Housing | Feb 12, 2020

4 products for your next multifamily project

These new products can help improve any new multifamily project.

Mixed-Use | Feb 7, 2020

Rising to the occasion

Roof deck entertainment spaces are popular amenities that present engineering and code complexities.

Multifamily Housing | Jan 31, 2020

Higher-income renters continue to drive what’s getting built and leased in the multifamily sector

Nearly half of all renters are “cost burdened,” according to the latest Joint Center for Housing Studies report.

Multifamily Housing | Jan 20, 2020

U.S. multifamily market posted solid gains in 2019

Rents grew 3% for the year, according to Yardi Matrix.

| Jan 19, 2020

New website, branding for NISUS

New website for NISUS

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021