flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mixed-use Seattle high-rise earns LEED Gold

Mixed-use Seattle high-rise earns LEED Gold


August 11, 2010
This article first appeared in the 200911 issue of BD+C.

Seattle’s 2201 Westlake development became the city’s first mixed-use and high-rise residential project to earn LEED Gold. Located in Seattle’s South Lake Union neighborhood, the newly completed 450,000-sf complex includes 300,000 sf of Class A office space, 135 luxury condominiums (known as Enso), and 25,000 sf of retail space. The project’s green features include underfloor HVAC delivery, high-performance central energy plant, water-efficient fixtures and fittings, drought-tolerant landscaping, and extensive material/construction waste recycling and salvaging. The project was developed by Vulcan Real Estate, designed by Callison, and constructed by Sellen Construction with Glumac as MEP.

Related Stories

Multifamily Housing | Mar 24, 2019

New York’s largest office-to-condo conversion nearing completion

One Wall Street will feature 100,000 sf of amenities and a three-level Whole Foods.

Building Tech | Mar 13, 2019

Almost everything you wanted to know about industrial construction

Our experts offer 15 tips on how best to perform factory-based construction.

Multifamily Housing | Mar 11, 2019

Kaiser Permanente takes aim at reducing chronic homelessness

Initiatives include a multimillion-dollar investment fund, and collaborating with a group that works with communities to house the unsheltered.

Multifamily Housing | Mar 6, 2019

MLK Plaza brings 167 units of affordable housing to the Bronx

The project was financed by the City’s ELLA program.

Multifamily Housing | Feb 26, 2019

275-unit residential building under construction at 2111 S. Wabash

Solomon Cordwell Buenz is designing the project.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021