Mortenson Construction was recently selected by San Diego-based developer enXco for the construction of the Pacific Wind Project. Located on the south slope of the Tehachapi Mountains in Kern County California, the 8,500 acres project will generate140 megawatts of wind power – enough energy to power approximately 39,000 homes.
Mortenson is responsible for the design and construction of access roads, foundations, erection, overhead and underground electrical collection system, and a 14,400-sf O&M facility that will support the Pacific Wind Project as well as other enXco projects slated for development in the area. Construction will begin in December 2011 and is expected to be complete in August 2012.
The Pacific Wind Project is the 19th wind power facility that Mortenson has constructed in partnership with enXco. Together the partnership has provided nearly 2 GW of energy throughout the United States. In early October, Mortenson completed construction of enXco’s 205.5 megawatt Lakefield Wind Project in southern Minnesota. In Minnesota alone, the enXco - Mortenson partnership has developed and constructed approximately 36% of the state’s wind energy capacity. BD+C
Related Stories
| Dec 5, 2011
SchenkelShultz Architecture designs Dr. Phillips Charities Headquarters building in Orlando
The building incorporates sustainable architectural features, environmentally friendly building products, energy-efficient systems, and environmentally-sensitive construction practices.
| Dec 2, 2011
What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20
Nominate a colleague, peer, or even yourself. Applications available here.
| Dec 2, 2011
Legrand joins White House initiative to spur energy efficiency in commercial buildings
Company agrees to aggressive energy savings and reporting.
| Dec 2, 2011
Goody Clancy awarded Ohio State residential project
The project, which is focused on developing a vibrant on-campus community of learning for OSU undergraduates.
| Dec 1, 2011
Nauset Construction breaks ground on Massachusetts health care center
The $20 million project is scheduled to be completed by December 2012.
| Dec 1, 2011
Ground broken on first LEED Platinum designed school house built by volunteers
Phoenix public school receives the generous gift of a state-of-the-art building for student and community use.
| Dec 1, 2011
VLK Architects’ office receives LEED certification
The West 7th development, which houses the firm’s office, was designed to be LEED for Core & Shell, which gave VLK the head start on finishing out the area for LEED Silver Certification CI.
| Nov 29, 2011
First EPD awarded to exterior roof and wall products manufacturer
EPD is a standardized, internationally recognized tool for providing information on a product’s environmental impact.
| Nov 29, 2011
Suffolk Construction breaks ground on Boston residential tower
Millennium Place III is a $220 million, 256-unit development that will occupy a full city block in Boston’s Downtown Crossing.
| Nov 29, 2011
Report finds credit crunch accounts for 20% of nation’s stalled projects
Persistent financing crunch continues to plague design and construction sector.