Mount Sinai Health System (MSHS) became the first health system in New York City to execute an Integrated Form of Agreement (IFOA) for their capital program at Mount Sinai St. Luke’s Hospital.
Other signatories to the IFOA include Francis Cauffman (architect), Syska Hennessy (engineer), and Turner Construction Company (contractor). Trade subcontractors that signed adjoining agreements as part of the Integrated Project Delivery (IPD) team are: EJ Electric, Fresh Meadows Mechanical, Heritage Mechanical, Cardoza Plumbing, Jacobsen Carpentry, Sirina Fire Protection, and Skyline Controls.
The Integrated Project Delivery (IPD) process is new to the New York healthcare construction market, though it has been used for several years elsewhere. CBRE Healthcare, retained to provide IPD advisory services, collaborated with Mount Sinai on the delivery model development beginning in 2015. Though the details of the contract were just recently finalized, the IPD team, operating collaboratively, began work on various projects over a year ago.
“The team has proven the value of the IPD process and the results thus far are leading us to consider wider adoption of the delivery model for capital programs at our other facilities,” said Ken Holden, Chief Facilities Officer for Mount Sinai Health System.
Related Stories
| Nov 19, 2013
Pediatric design in an adult hospital setting
Freestanding pediatric facilities have operational and physical characteristics that differ from those of adult facilities.
| Nov 19, 2013
Top 10 green building products for 2014
Assa Abloy's power-over-ethernet access-control locks and Schüco's retrofit façade system are among the products to make BuildingGreen Inc.'s annual Top-10 Green Building Products list.
| Nov 18, 2013
6 checkpoints when designing a pediatric healthcare unit
As more time and money is devoted to neonatal and pediatric research, evidence-based design is playing an increasingly crucial role in the development of healthcare facilities for children. Here are six important factors AEC firms should consider when designing pediatric healthcare facilities.
| Nov 15, 2013
Greenbuild 2013 Report - BD+C Exclusive
The BD+C editorial team brings you this special report on the latest green building trends across nine key market sectors.
| Nov 15, 2013
Pedia-Pod: A state-of-the-art pediatric building module
This demonstration pediatric treatment building module is “kid-friendly,” offering a unique and cheerful environment where a child can feel most comfortable.
| Nov 14, 2013
Behind the build: BD+C's 'Pedia-Pod' modular pediatric patient unit at Greenbuild 2013 [slideshow]
Next week at Greenbuild, BD+C will unveil its demonstration pediatric patient unit, called Pedia-Pod. Here's a behind-the-scenes look at the construction of this unique modular structure.
| Nov 13, 2013
Installed capacity of geothermal heat pumps to grow by 150% by 2020, says study
The worldwide installed capacity of GHP systems will reach 127.4 gigawatts-thermal over the next seven years, growth of nearly 150%, according to a recent report from Navigant Research.
| Nov 8, 2013
Oversized healthcare: How did we get here and how do we right-size?
Healthcare facilities, especially our nation's hospitals, have steadily become larger over the past couple of decades. The growth has occurred despite stabilization, and in some markets, a decline in inpatient utilization.
| Nov 1, 2013
CBRE Group enhances healthcare platform with acquisition of KLMK Group
CBRE Group, Inc. (NYSE:CBG) today announced that it has acquired KLMK Group, a leading provider of facility consulting, project advisory and facility activation solutions to the healthcare industry.
| Oct 30, 2013
15 stellar historic preservation, adaptive reuse, and renovation projects
The winners of the 2013 Reconstruction Awards showcase the best work of distinguished Building Teams, encompassing historic preservation, adaptive reuse, and renovations and additions.