flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Multifamily building with 25,000 sf of amenities rises on the shore of the Potomac River

Multifamily Housing

Multifamily building with 25,000 sf of amenities rises on the shore of the Potomac River

The building is part of the National Gateway mixed-use development at Potomac yard.


By David Malone, Associate Editor | February 22, 2018
The Sur multifamily development
The Sur multifamily development

The National Gateway mixed-use development at Potomac Yard, the 295-acre site of a former railroad switch yard, is about to receive a new 12-story, 360-unit residential building. Dubbed The Sur, the new building will occupy a 1.67-acre site at 3400 Potomac Avenue.

The design for The Sur was inspired by Big Sur, a rugged stretch of California’s central coast. The Sur will meld sustainable and rustic features with more modern elements. Units will feature high-end finishes and range in size from 557-sf studios to 1,419-sf three-bedroom units.

Additionally, The Sur will comprise 16,500 sf of retail space and 25,000 sf of amenities. Amenities include:

 

— Outdoor landscaped oasis meant to mimic the feel of a national park with large boulders, moss, forest trees, a fire pit, and seating areas.

— An eighth floor Party Room with a fireplace, bar, and a large table, all of which is connected to a spacious outdoor terrace with Potomac River and National Monument views.

— Rooftop spa oasis with cabanas, natural landscaping, and a water element that surround seating areas and fire pits.

— Fitness center and adjacent outdoor lawn for Yoga and an area to gather for movie nights.

— Floating fire place and lounge with “worm hole” seating in the south lobby

— Dog spa and wash area

— Conference room/business center enclosed in a wood and glass structure in the north lobby

 

The Sur sits on the shore of the Potomac River and is just minutes from Reagan National Airport. Erkiletian is the project’s developer and Carlyn and Company Interiors + Design is leading the interior architecture and design development of the 25,000 sf of amenities. The building is slated for completion in April 2020.

Related Stories

Multifamily Housing | Jul 20, 2020

Abandoned 15-story high-rise becomes mixed-use luxury apartment building

Kimmich Smith Architecture designed the project.

Coronavirus | Jul 20, 2020

Student housing amid the pandemic, infection control in buildings, and future airport design on "The Weekly"

Experts from Core Spaces, Bala Consulting Engineers, and Populous were interviewed in the July 23 streaming program from Horizon TV.

Mixed-Use | Jul 14, 2020

Apartments and condos occupy what was once a five-story car dealership

Wisznia | Architecture+Development designed, developed, and is managing the project.

Multifamily Housing | Jul 7, 2020

AEMSEN develops concept for sustainable urban living

The concept has been created for the redevelopment of the lots on the Barbizonlaan in Capelle aan den IJssel.

Multifamily Housing | Jun 29, 2020

New affordable housing development comes to the Bay Area

The two phase project will provide 100 affordable units total.

Multifamily Housing | Jun 23, 2020

11 tips on how to install EV charging stations in multifamily housing

A top sustainability expert gives the whys and wherefores of installing electric vehicle charging posts in your next multifamily enterprise.

Coronavirus | Jun 19, 2020

Experts address COVID-19's impact on nursing homes and schools on The Weekly

The June 18 episode of BD+C's "The Weekly" is available for viewing on demand. 

Senior Living Design | Jun 11, 2020

COVID-19: An "outdoor living room" for senior living residents to safely visit with their families

Aegis Living creates a plexiglass-wrapped outdoor space for residents to sit while visiting with family members.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021