flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Multipurpose sports facility will be first completed building at Obama Presidential Center

Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

Located in Chicago’s Jackson Park, the 45,000-sf multipurpose sports facility and events space features a regulation-size NBA basketball court. The facility’s design is inspired by two of President Obama’s passions: basketball and community building.


By Novid Parsi, Contributing Editor  | April 8, 2024
Multipurpose sports facility will be first completed building at Obama Presidential Center
Rendering: Obama Foundation

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. 

Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan. Elevate Design Builders, a joint firm led by Bowa Construction and AECOM Hunt, is the builder.

The Home Court features a regulation-size NBA basketball court with intersecting practice courts, flexible seating, fitness equipment, and training spaces. A mezzanine level provides additional seating for an intimate spectator experience. Home Court also offers multipurpose spaces for community activities.

The Home Court’s design is inspired by two of President Obama’s passions: basketball and community building. The sleek metal and glass panel exterior has been patterned to evoke a basketball net and community connection. The expansive, east-facing glass façade—fritted to protect birds by keeping them from striking it—will offer views of the campus.

“From the outset, President Obama knew he wanted our Home Court to be a place where people could come for fun, inspiration, and learning—the kind of community spaces we need in an inclusive democracy,” Obama Foundation CEO Valerie Jarrett said in a statement. “We intend for it to be an extraordinary resource to our community that will allow families to improve their health and wellness, and participate in educational and career readiness programming all in hopes of building a brighter, healthier future.”  

The design aligns with the Obama Foundation’s sustainability goals for the campus. The two-story lobby will provide natural light for many of the building’s interior spaces. Like the rest of the campus, the Home Court will be heated and cooled mostly with geothermal energy, part of the campus-wide strategy to avoid using fossil fuels.

Rendering: Obama Foundation
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation

 

Related Stories

Cultural Facilities | Apr 16, 2018

Best in library design 2018: Six projects earn AIA/ALA library awards

Austin Central Library and the Tulsa City-County Central Library are among the top projects for 2018. 

Cultural Facilities | Jan 23, 2018

BIG reveals revised Smithsonian Campus master plan

The original proposal was first unveiled in 2014.

Mixed-Use | Dec 12, 2017

A new live/work neighborhood is about to get under way in Omaha, Neb.

Walkability and recreation will be key features of West Farm.

Cultural Facilities | Nov 2, 2017

Perkins Eastman wins competition to redesign San Francisco’s Harvey Milk Plaza

The Friends of Harvey Milk Plaza unanimously selected the Perkins Eastman entry as the winner.

Museums | Oct 3, 2017

Denmark’s new LEGO experience hub looks like it’s made out of giant LEGO blocks

The 12,000-sm building is part of Billund, Denmark’s goal to become the ‘Capital for Children.’

Museums | Aug 15, 2017

Underground Railroad Visitor Center tells story of oppression, then freedom

The museum is conceived as a series of abstracted forms made up of two main structures, one administrative and one exhibit.

Cultural Facilities | Jul 13, 2017

A WWII bunker becomes a museum along Denmark’s coast

BIG’s design of this cultural center is the “antithesis” of the fortress.

Museums | Jul 5, 2017

Addition by subtraction: Art Share L.A. renovation strips away its acquired superfluity

The redesign of the 28,000-sf building is prioritizing flexibility, openness, and connectivity.

Performing Arts Centers | Jun 30, 2017

L.A.’s John Anson Ford Amphitheater might finally be ready for its close-up

The performing arts venue, nearly a century old, has undergone an extensive refurbishing.

boombox1
boombox2
native1

More In Category



Museums

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

In Richardson, Tex., the University of Texas at Dallas has opened a second location for the Crow Museum of Asian Art—the first of multiple buildings that will be part of a 12-acre cultural district. When completed, the arts and performance complex, called the Edith and Peter O’Donnell Jr. Athenaeum, will include two museums, a performance hall and music building, a grand plaza, and a dedicated parking structure on the Richardson campus.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021