Nine and a half acres may sound like adequate space for a 70,000-sf building, but when that acreage is shoehorned into a narrow corridor, problems can quickly arise. Such was the case for the LA Metro Division 14 Expo Light Rail Operations & Maintenance Facility.
To make the building site work, the design team needed to make as efficient use of the space as possible. Building spaces overlap over the rail yard and maintenance area and 34-foot-long moment frames span two tracks. Part of the building’s main hallway hangs over the maintenance area, as well.
To account for the OCS and pantograph and still meet California’s seismic requirements, open-span moment frames that allow train travel were used in the north-south direction in combination with brace frames in the other direction.
The design of the long, narrow building is more than just a product of its location. The facility goes beyond the basic functionality requirements of a typical operations and maintenance facility and promotes employee wellbeing and integrates into the surrounding neighborhood. The building incorporates plenty of natural light and is net-zero-energy ready and on track to attain LEED Gold certification.
Natural light played a huge role in the design team’s quest to incorporate the latest research in design for workplace wellbeing. Large skylights above the maintenance area fill the space with natural daylight while large roof vents naturally exhaust heated air. A floor-to-ceiling glazed curtain wall provides natural light and views to operations administrative offices, the control suite, and the operators room and amenities.
The site’s narrow dimensions heavily influenced the building’s design and led to the overlapping of some building spaces. Chang Kim photograph.
Building – Submitting firm, architect RNL Design Owner Los Angeles County Metropolitan Transportation Authority Structural engineer Nabih Youssef & Associates Structural Engineers MEP engineer Glumac
General Information – Size 70,000 sf Cost $100 million Construction time October 2011 to April 2016 Delivery method Design-bid- build
Related Stories
Building Team Awards | Jun 14, 2017
17 projects earn BD+C's 2017 Building Team Awards
Of the 17 projects, one received a Platinum Award, six received Gold Awards, six received Silver Awards, two received Bronze Awards, and two received Honorable Mentions.
Building Team Awards | Jun 14, 2017
3D-printed office: Office of the Future
Dubai kicks off 3D-printing tech initiative with a novel office project.
Building Team Awards | Jun 14, 2017
A space for all: Lighthouse for the Blind and Visually Impaired
Nonprofit HQ fitout improves functionality, accessibility for blind and low-vision individuals.
Building Team Awards | Jun 13, 2017
Government campus reimagined: Intelligence Community Campus
Building Team converts 1940s campus into a sleek, modern home for U.S. intelligence agencies.
Building Team Awards | Jun 13, 2017
Secluded sanctuary: Alnoba leadership training center
Leadership training center becomes New England’s first Passive House building.
Building Team Awards | Jun 12, 2017
Circles and squares: Faena Arts Center
Silver Award: The Faena Arts Center’s forum is divided into two volumes, one a cylinder, the other a cube.
Building Team Awards | Jun 12, 2017
The right prescription: University of North Dakota School of Medicine & Health Sciences
Silver Award: North Dakota builds a new medical/health sciences school to train and retain more physicians.
Building Team Awards | Jun 12, 2017
Texas technopark: TechnipFMC John T. Gremp Campus
Silver Award: TechnipFMC’s new campus marks the start of a massive planned community in north Houston.
Building Team Awards | Jun 8, 2017
Quick turnaround: Partners HealthCare
Silver Award: A 2½-year project brings Partners HealthCare’s sprawling administrative functions under one roof.
Building Team Awards | Jun 8, 2017
Raising the bar: Zurich North American Headquarters
Silver Award: Forgoing a typical center-core design, the Zurich North America Headquarters rises 11 stories across three stacked bars.