flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New ASHRAE standard defines ‘zero energy’ and ‘zero carbon’ buildings

Codes and Standards

New ASHRAE standard defines ‘zero energy’ and ‘zero carbon’ buildings

The standard draws from other ASHRAE standards to address energy and carbon flows across a site boundary, their measurement, and their balance.


By Peter Fabris, Contributing Editor | May 8, 2023
Photo by Dids via Pexels

Photo by Dids via Pexels

ASHRAE has released a new standard that defines the terms "zero Energy" and "zero carbon" to describe buildings.

ANSI/ASHRAE Standard 228-2023, Standard Method of Evaluating Zero Net Energy and Zero Net Carbon Building Performance, sets requirements for evaluating whether a building or group of buildings meets a definition of “zero net energy” or a definition of “zero net carbon” during operation. The standard draws from other ASHRAE standards to address energy and carbon flows across a site boundary, their measurement, and their balance.

“Achieving a zero energy building has been viewed by many as a difficult goal to meet, with unforeseeable roadblocks and differing guidance,” said Keith Emerson, P.E., Life Member ASHRAE, chair of the Standards Project Committee 228. Standard 228 provides a consistent method for determining whether new and existing sites have reached zero energy. We hope this standard will become a helpful resource for building professionals in strategic decarbonization planning.”

Features of Standard 228 include:

  • Allowances for sites that lack the means to produce adequate renewable energy, while placing additional requirements on the use of external carbon and renewable energy in the calculation.
  • Defined calculation of energy in terms of source—a multiplier on the energy crossing the site boundary including energy used or lost in extraction, generation, and transit to the site.
  • The main energy calculation made in terms of annual average factors. Allowance is made for the calculation of individual hours where data is available.

Related Stories

Codes and Standards | Apr 23, 2020

COVID-19 epidemic demonstrates value of flexible hospital space

Some rooms being repurposed for ICU care.

Codes and Standards | Apr 15, 2020

Embodied carbon footprint can be reduced by using conventional materials

High-SCM concrete, and cellulose and wood fiber insulation among the greener alternatives.

Coronavirus | Apr 13, 2020

COVID-19 alert: City conducts a 'virtual building inspection' to allow Starbucks and bank to open

Bothell, Wash., issues a certificate of occupancy to developer after inspecting the property online. 

Codes and Standards | Apr 13, 2020

Design competition focuses on reducing urban heat island effect

Cool Abu Dhabi aims to transform urban life in the Middle East.

Codes and Standards | Apr 13, 2020

What building science says about reducing COVID-19 transmission

Impact of temperature and relative humidity is unclear.

Codes and Standards | Apr 9, 2020

Owners retrofitting properties, monitoring performance during epidemic

Covid-19 outbreak may lead employers to reevaluate office commitments.

Codes and Standards | Apr 7, 2020

Dept. of Labor publishes guidance on paid sick leave, expanded family and medical leave

Includes fact sheets for employees, employers, and a questions and answers document.

Codes and Standards | Apr 1, 2020

Standards and codes meetings halted, postponed

ASTM International cancels in-person standards meetings; DOE’s National Energy Codes Conference postponed.

Codes and Standards | Mar 26, 2020

Ransomware attack on Canadian contractor underscores need for cybersecurity

Victimized company Bird Construction has defense, law enforcement contracts.

Codes and Standards | Mar 23, 2020

Contractors should scrutinize contracts carefully amid Covid-19 crisis

Compliance with time-sensitive notice requirements and careful documentation required.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021