A new 12-story hotel has broken ground in Denver near Coors Field and Union Station and while the majority of the hotel will have a sleek, modern aesthetic, one component will definitely stand out from the rest.
The historic Denver Hose Company No.1 building, which was constructed in 1883, will be incorporated into the hotel’s design. The building was listed as a city historic landmark in 1986 and is one of the only remaining structures from an early Denver neighborhood called the “Bottoms,” The Denver Post reports. The building is described as having beautiful brickwork, especially around the two front facing arches.
The building will be completely restored as part of the $80 million hospitality project and will serve as a restaurant and outdoor patios for the hotel. The patios will face Chestnut Place and 20th Street.
And the restoration couldn’t come a moment too soon. The fire station has been in a state of disrepair for years now, to the point where some people worried about it becoming a safety issue. It had all the looks of a structure ready to collapse on itself, but with help from the city and Historic Denver (an organization that preserves local Denver history, architecture, and landscapes), the building was stabilized until the restoration could begin.
Johnson Nathan Strohe and Boss Architecture designed the new hotel, which will be a Hilton Garden Inn. It will comprise 233 guest rooms and be operated by Davidson Hotels. Among the amenities the hotel will offer are a ballroom, meeting space, underground parking, and a fitness center.
The new Hilton Garden Inn is expected to open in early 2019.
Related Stories
| Sep 19, 2013
What we can learn from the world’s greenest buildings
Renowned green building author, Jerry Yudelson, offers five valuable lessons for designers, contractors, and building owners, based on a study of 55 high-performance projects from around the world.
| Sep 19, 2013
6 emerging energy-management glazing technologies
Phase-change materials, electrochromic glass, and building-integrated PVs are among the breakthrough glazing technologies that are taking energy performance to a new level.
| Sep 19, 2013
Roof renovation tips: Making the choice between overlayment and tear-off
When embarking upon a roofing renovation project, one of the first decisions for the Building Team is whether to tear off and replace the existing roof or to overlay the new roof right on top of the old one. Roofing experts offer guidance on making this assessment.
| Sep 17, 2013
Healthcare project will merge outpatient clinic with YMCA to promote wellness and prevention
Penrose-St. Francis Health Services and the YMCA of the Pikes Peak Region announce collaboration, along with developer The Boldt Company, to create next-generation wellness facility.
| Sep 16, 2013
Study analyzes effectiveness of reflective ceilings
Engineers at Brinjac quantify the illuminance and energy consumption levels achieved by increasing the ceiling’s light reflectance.
| Sep 13, 2013
Loews Hotels & Resorts announces major cross-portfolio upgrades
Loews Hotels & Resorts is currently in the midst of a major growth and property redesign initiative, reflecting a strong national trend in hospitality renovation.
| Sep 11, 2013
BUILDINGChicago eShow Daily – Day 3 coverage
Day 3 coverage of the BUILDINGChicago/Greening the Heartland conference and expo, taking place this week at the Holiday Inn Chicago Mart Plaza.
| Sep 10, 2013
The new medical office building: 7 things to know about today’s outpatient clinic
Regulatory pressures, economic constraints, and emerging technologies are transforming healthcare. Learn how Building Teams are responding with efficient, appealing, boundary-blurring outpatient buildings.
| Sep 10, 2013
BUILDINGChicago eShow Daily – Day 2 coverage
The BD+C editorial team brings you this real-time coverage of day 2 of the BUILDINGChicago/Greening the Heartland conference and expo taking place this week at the Holiday Inn Chicago Mart Plaza.
| Sep 4, 2013
Augmented reality goes mainstream: 12 applications for design and construction firms
Thanks to inexpensive mobile devices and increasingly advanced software apps, Building Teams are finally able to bring their BIM models to life on the job site.