flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New digital platform to foster construction supply chains free of forced labor

New digital platform to foster construction supply chains free of forced labor

Will provide transparency on where building materials come from and how they are made.


By Peter Fabris, Contributing Editor  | September 28, 2022
Construction Supply Chain
Courtesy Pexels.

Design for Freedom by Grace Farms and the U.S. Coalition on Sustainability formed a partnership to advance shared goals regarding sustainable and ethical building material supply chains that are free of forced labor.

SustainChain, the coalition’s technology platform, uses advanced digital technology and machine learning to bring together innovators, impact investors, businesses, NGOs, and public-private sector alliances to advance the UN Sustainable Development Goals (SDGs). That program is a comprehensive plan consisting of 17 interrelated goals that address and resolve global humanitarian challenges.

“The next step in architectural justice is to include social equity and ethical material transparency in the evaluation of our supply chains so we can understand where our building materials come from and how they are made,” said Grace Farms Foundation CEO and founder Sharon Prince. “Design for Freedom is doing just that—raising awareness of forced labor embedded in our building materials and initializing responses to disrupt forced labor in the building materials supply chain and to come together to create more transparency.”

“As a first of its kind accelerator for achieving a more just and sustainable world, SustainChain is providing a free public utility designed to unify and rapidly scale sustainability efforts,” said Jacqueline Corbelli, founder of the US Coalition on Sustainability and creator of SustainChain.

Related Stories

| Nov 10, 2011

Suffolk Construction awarded MBTA transit facility and streetscape project

The 21,000-sf project will feature construction of a cable-stayed pedestrian bridge over Ocean Avenue, an elevated plaza deck above Wonderland MBTA Station, a central plaza, and an at-grade pedestrian crossing over Revere Beach Boulevard

| Nov 10, 2011

Thornton Tomasetti’s Joseph and Choi to co-chair the Council on Tall Buildings and Urban Habitat’s Outrigger Design Working Group

Design guide will describe in detail the application of outriggers within the lateral load resisting systems of tall buildings, effects on building behavior and recommendations for design. 

| Nov 9, 2011

American Standard Brands joins the Hospitality Sustainable Purchasing Consortium

  American Standard will collaborate with other organizations to build an industry-wide sustainability performance index.

| Nov 8, 2011

Transforming a landmark coastal resort

Originally built in 1973, the building had received several alterations over the years but the progressive deterioration caused by the harsh salt water environment had never been addressed.

| Nov 8, 2011

WEB EXCLUSIVE: Moisture-related failures in agglomerated floor tiles

Agglomerated tiles offer an appealing appearance similar to natural stone at a lower cost. To achieve successful installations, manufacturers should provide design data for moisture-related dimensional changes, specifiers should require in-situ moisture testing similar to those used for other flooring materials, and the industry should develop standards for fabrication and installation of agglomerated tiles.

| Nov 8, 2011

$11 million business incubator Florida Innovation Hub at the University of Florida completed by Charles Perry Partners, Inc.

The facility houses the UF Office of Technology Licensing, UF Tech Connect, other entities, and more than 30 startup technology tenants.

| Nov 8, 2011

Designer joins Holabird & Root

Clifton has been awarded numerous awards throughout her career, including two AIA Chicago Design Excellence Awards.

| Nov 4, 2011

Mortenson Construction builds its fifth wind facility In Illinois

Shady Oaks Wind Farm is under construction near Compton, Ill.

| Nov 4, 2011

McCarthy completes construction of South Region High School No. 2 in Los Angeles

Despite rain delays and scope changes, the $96.7 million high school was completed nearly two-months ahead of schedule.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021