flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New federal project plans must include climate impacts

Sustainability

New federal project plans must include climate impacts

Agencies must quantify the specific impacts when possible.


By Peter Fabris, Contributing Editor | August 30, 2016

Pixabay Public Domain

The federal Council on Environmental Quality will ask agencies to include climate change when evaluating new projects.

Agencies must quantify the climate impacts of their decisions, when possible. The directive also asks decision-makers to consider alternative ways to approach or design a project that could better prepare the U.S. for a changing climate.

Some federal agencies had been considering the impact on climate change when making decisions. They tended to operate from earlier draft guidance, and did not always apply them uniformly, though.

New guidance suggests trying to calculate how many carbon dioxide emissions a new project, permit, or other agency action would cause. It also may involve calculating how much carbon may be sequestered as the result of a decision.

Related Stories

Sustainability | Feb 11, 2019

AEC firms practice what they preach

The advice about wellness firms dispense to clients in many cases has already been road tested to make their own workplaces healthier.

Market Data | Feb 4, 2019

U.S. Green Building Council announces annual Top 10 States for LEED Green Building in 2018

Illinois takes the top spot as USGBC defines the next generation of green building with LEED v4.1.

Sustainability | Feb 1, 2019

Designing a net zero aquatic center

Buildings can be designed to cut consumption and operate more efficiently, but the pools always make it difficult to achieve substantial savings.

Sustainability | Jan 30, 2019

Denmark to build nine industrial, energy-producing islands surrounded by a ‘nature belt’

The project will be located 10 km (6.2 miles) south of Copenhagen.

Green | Jan 28, 2019

This is the country’s greenest academic building

Perkins+Will designed the building.

Sustainability | Nov 5, 2018

How the built environment can help the climate crisis

Our buildings and cities will have to experiment with new climate responsive forms, and in many cases, the built environment will require dramatic shifts to achieve true resilience and continue working towards a carbon-neutral society.

Sustainability | Oct 25, 2018

As project delivery models evolve, designers rethink their role

New York City’s newest university campus, Cornell Tech, pushes the limits of sustainable and resilient design.

Green | Oct 17, 2018

USGBC survey suggests employees are happier, healthier, and more productive in LEED green buildings

Can healthier, more sustainable buildings give employers a hiring edge to attract best in class talent?

Sustainability | Oct 3, 2018

Introducing sustainable design early leads to more resilient projects

Many companies are influenced by the misconception that only some projects can qualify as sustainable.

Sustainability | Sep 18, 2018

Starbucks to build 10,000 “Greener Stores” by 2025

The company is teaming with SCS Global Services and World Wildlife Fund to develop the Greener Stores framework.

boombox1
boombox2
native1

More In Category


Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021