flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Frank Gehry project on Sunset Boulevard moves forward with a few compromises

Mixed-Use

New Frank Gehry project on Sunset Boulevard moves forward with a few compromises

Among the compromises, the 8150 Sunset Blvd. project will see its tallest residential tower reduced by 56 feet.


By David Malone, Associate Editor | October 31, 2016

Rendering courtesy of Visualhouse.

A planned mixed-use development from Frank Gehry and located on Sunset Boulevard will be moving forward after the Planning and Land Use Management Committee voted unanimously to approve the plans.

As the Los Angeles Times reports, however, a few compromises were required before the project could move forward. As it stands now, the project consists of two residential towers comprising 229 units (38 of which are for low-income residents), 65,000 sf of commercial space, and a pedestrian plaza. The project arrived at these numbers after the area’s councilman, David Ryu, said he would not support the development unless the 15-story residential tower was downsized, included more affordable housing units, and had additional parking spots added.

All of these conditions were met causing the tower to shrink from 234 feet to 178 feet, the number of parking spots to increase to 494, and the sidewalks to widened to 15 feet.

Even with the compromises, including the smaller size that makes the new tower more in line with the height of surrounding buildings, some neighboring residents are expressing a bout of NIMBYism. They believe the development will still be out of scale with the surrounding area, will ruin their views, and may produce heavy traffic in the area due to all of the new residents. Despite their concerns, the scaled-back project is moving forward.

Tags

Related Stories

Mixed-Use | Sep 21, 2017

Entire living rooms become balconies in a new Lower East Side mixed-used development

NanaWall panels add a unique dimension to condos at 60 Orchard Street in New York City.

Mixed-Use | Sep 18, 2017

Urban heartbeat: Entertainment districts are rejuvenating cities and spurring economic growth

Entertainment districts are being planned or are popping up all over the country.

Mixed-Use | Sep 14, 2017

Capital One eschews the traditional bank with the Capital One Café

The new branch in downtown Santa Monica offers 8,400 sf of space designed by Gwynne Pugh Urban Studio.

Libraries | Sep 1, 2017

Johnson Favaro selected to design new main library in Riverside, Calif.

The choice comes after a 12-year planning process and a yearlong selection process.

Mixed-Use | Aug 30, 2017

Former industrial building becomes 'lifestyle community' in ever-evolving Baltimore

The new community offers 292 apartments with 20,000 sf of retail space.

Mixed-Use | Aug 30, 2017

A 50-acre waterfront redevelopment gets under way in Tampa

Nine architects, three interior designers, and nine contractors are involved in this $3 billion project.

Mixed-Use | Aug 18, 2017

Covington, Wash., greenlights a 214-acre mixed-use development

A peninsula will extend into the property’s 20-acre lake and contain retail shops, restaurants, a pavilion park, homes, and green space.

Mixed-Use | Aug 17, 2017

Manhattan’s Union Square gets its very own farmhouse

GrowNYC, a sustainability-focused nonprofit, commissioned ORE Design to create the community events center and learning space.

Mixed-Use | Aug 15, 2017

A golf course community converts into an agrihood with 1,150 homes and a working olive grove

The community will cover 300 acres in Palm Springs, Calif.

Mixed-Use | Aug 10, 2017

Mixed-use development includes University of California-San Diego campus extension

The 562,000-sf development was designed by Carrier Johnson + CULTURE and is located five blocks from the San Diego Padres’ Petco Park.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021