flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New guidelines for replacing windows without removing exterior brick veneer

Reconstruction & Renovation

New guidelines for replacing windows without removing exterior brick veneer

The guidelines cover residential and light commercial buildings of less than four stories above grade.


By Peter Fabris, Contributing Editor | October 26, 2020
New guidelines for replacing windows without removing exterior brick veneer

Photo: Pexels via Pixabay

   

The Fenestration Manufacturers Association (FMA), the Fenestration and Glazing Industry Alliance (FGIA), and the Window & Door Manufacturers Association (WDMA) have released a new document focused on replacement windows.

FMA/AAMA/WDMA 2710-20, Guidelines for the Full Frame Replacement of Windows without Removal of Exterior Brick Veneer covers windows replacement in residential and light commercial buildings of not more than three stories above grade. It pertains to structures using a membrane/drainage system, a surface barrier drainage, or a wall system without a reliable membrane drainage system.

The document is focused on the full frame replacement without removal of external brick veneer. It describes methods where the cavity between the wall and façade needs to be blocked and sealed.

“This newly document is the first installation practice to address this window-wall condition, which also includes a 'decision-tree' matrix to guide installers to the most appropriate methods,” said Jim Katsaros (DuPont Performance Building Solutions), co-chair of the Joint Replacement Window Task Group. “The task group evaluated numerous configuration variations and completed representative installations with comprehensive field testing in actual homes in Baton Rouge, Louisiana.”

Related Stories

| May 31, 2013

$3 million renovation leads to rebirth of Boston hotel with new upscale identity

After a $3 million renovation, the Bulfinch Hotel in Boston has been reborn as the Boxer, a more upscale property.

| May 28, 2013

Renovated casino part of redevelopment project at Los Angeles-area racetrack

Hollywood Park racetrack in Inglewood, Calif., will soon become Hollywood Park Tomorrow, a 238-acre development project.

| May 2, 2013

New web community aims to revitalize abandoned buildings

Italian innovators Andrea Sesta and Daniela Galvani hope to create a worldwide database of abandoned facilities, ripe for redevelopment, with their [im]possible living internet community.

| Apr 19, 2013

Must see: Shell of gutted church on stilts, 40 feet off the ground

Construction crews are going to extremes to save the ornate brick façade of the Provo (Utah) Tabernacle temple, which was ravaged by a fire in December 2010.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.



Brick and Masonry

A journey through masonry reclad litigation

This blog post by Walter P Moore's Mallory Buckley, RRO, PE, BECxP + CxA+BE, and Bob Hancock, MBA, JD, of Munsch Hardt Kopf & Harr PC, explains the importance of documentation, correspondence between parties, and supporting the claims for a Plaintiff-party, while facilitating continuous use of the facility, on construction litigation projects.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021