flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New iPad app ready for prime time

New iPad app ready for prime time

Siemens’ versatile application connects users to APOGEE BAS control and monitoring functions via wireless network connectivity. The application directly interacts with BACnet/IP and Siemens APOGEE P2 field panels. 


By By BD+C Staff | January 24, 2012
Users can develop their own customized interface graphics using Facility Prime Editor or, if desired, have their local Siemens r

Siemens Building Technologies Division announced today the launch of its Facility Prime native Apple iOS application for the APOGEE Building Automation System (BAS). Through customized screens, Facility Prime enables fast, convenient, mobile interaction with a multitude of facility conditions. 

Facility Prime goes beyond accessing data and provides two-way interaction between users and the building automation systems they manage. Siemens’ versatile application connects users to APOGEE BAS control and monitoring functions via wireless network connectivity. The application directly interacts with BACnet/IP and Siemens APOGEE P2 field panels. 

Users can develop their own customized interface graphics using Facility Prime Editor or, if desired, have their local Siemens representative create a dynamic interface to suit their facility management needs. After accessing the network, users can view environmental conditions via this custom-tailored interface. Users can also connect to their facility’s BAS via the enterprise’s virtual private network if available. After proper access credentials are authenticated, users can command points and equipment.  Commands made from Facility Prime are logged in the APOGEE Insight System Activity Log.

Facility Prime delivers a variety of convenient, but powerful facility systems management features to the dynamic iPad platform including: 

  • The “Graphics” view, which allows Facility Prime users to monitor in real-time building environmental conditions and HVAC equipment;
  • A “Report” function that captures current conditions and either saves the GUI image as a file or embeds it in an email;
  • A patent-pending “Scan” function which opens a scanning feature employing Quick Response (QR) barcodes to trigger actions such as navigating to graphics;
  • A “List” view providing a quick, non-graphical status check of important data points with Green / Red color bar status;
  • A “Charts” function that provides key static or dynamic graphs for analysis of facility data, and
  • A “Tools” view providing Editor function users the ability to browse and command selected facility data objects.

Facility Prime becomes available in February. BD+C

Related Stories

Laboratories | Oct 5, 2022

Bigger is better for a maturing life sciences sector

CRB's latest report predicts more diversification and vertical integration in research and production.

Multifamily Housing | Oct 5, 2022

Co-living spaces, wellness-minded designs among innovations in multifamily housing

The booming multifamily sector shows no signs of a significant slowdown heading into 2023. Here is a round up of Giants 400 firms that are driving innovation in this sector.

Contractors | Oct 5, 2022

Materials shortages, cost spikes throwing Design-Bid-Build process out of whack

The traditional Design-Bid-Build delivery process is under considerable stress this year as materials shortages and cost spikes are upending usual practices, according to a new report from JLL.

Green | Oct 5, 2022

In California, a public power provider’s new headquarters serves as a test case for an innovative microgrid and for reducing greenhouse gas emissions

Sonoma Clean Power (SCP), the public power provider for California’s Sonoma and Mendocino Counties, recently unveiled its new all-electric headquarters.

Contractors | Oct 4, 2022

Which comes first, the building or the cost estimate?

At the start of a project, don’t forget to establish financial parameters when you’re discussing the design and program. By establishing the costs up front, you can avoid the pitfalls that might derail your project and guarantee its lasting success.

Fire and Life Safety | Oct 4, 2022

Fire safety considerations for cantilevered buildings

Bold cantilevered designs are prevalent today, as developers and architects strive to maximize space, views, and natural light in buildings. Cantilevered structures, however, present a host of challenges for building teams, according to José R. Rivera, PE, Associate Principal and Director of Plumbing and Fire Protection with Lilker.

| Oct 4, 2022

Rental property owners want access to utility usage data for whole properties

As pressure from investors for ESG reporting mounts, owners of multifamily properties increasingly look to collect whole-building utility usage data.

| Oct 4, 2022

In dire need of affordable housing, Aspen, Colo. will get a development that provides 277 affordable homes

A few miles from downtown Aspen, Colo., a development will provide 277 new affordable homes for an area experiencing a dire affordable housing crisis.

Green | Oct 3, 2022

California regulators move to ban gas heaters for existing buildings

California regulators voted unanimously recently on a series of measures that include a ban on the sale of natural gas-powered heating and hot water systems beginning in 2030.

| Oct 3, 2022

The College of the Holy Cross completes a $110 million performing arts center

In Worcester, Mass., a one-hour drive from Boston, the College of the Holy Cross has completed its $110 million Prior Performing Arts Center.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021