The images of residents gathered on rooftops to escape flood waters are indelible 10 years after Hurricane Katrina buffeted New Orleans. In the years since, the city has moved ahead with resilience strategies that may become a model for other communities.
The Louisiana Audubon and a coalition of other environmental groups recently released a report on what has been done and where more needs to be invested to prepare the area for the next big storm. More than $14 billion went towards rebuilding the levees and other flood protections and the result has been called "best flood control system of any coastal community."
The formation of the Louisiana Coastal Protection and Restoration Authority (CPRA) and the creation of a state coastal master plan have led to a long-term approach to achieving a sustainable coast. The plan, to be updated every five years, focuses on coastal protection and restoration projects.
Other resiliency efforts include raising individual houses out of the flood plain and educating the public about storm safety and response. For example, Terrebonne Parish won funding through Federal Emergency Management Agency grants and state programs to raise more than 1,000 homes.
Related Stories
| Dec 15, 2011
Dayton, Ohio schools saving $2.6 million annually by building to LEED
On average, green schools save about $100,000 a year on operating costs, including energy and water savings.
| Dec 15, 2011
Building to LEED standards can pose new risks for construction workers
Workers on these projects suffer a 24% increase in falls to lower levels during roof work, which researchers attributed to the installation of solar panels, and a few other risks.
| Dec 15, 2011
NRDC charges Maine governor with weakening green wood requirement
The FSC program is administered through the Leadership in Energy and Environmental Design (LEED) and requires wood to be harvested in a sustainable way.
| Dec 15, 2011
Post-tornado, Tuscaloosa seeks to create walkable urban, retail areas
Block sizes initially were limited to a maximum perimeter of 1,750 feet, with no side of the block being longer than 500 feet.
| Dec 15, 2011
Allentown, Pa. city council asked to repeal union-friendly law
The mayor of Allentown, Pa. asked the City Council to repeal a year-old ordinance that forces contractors to hire union workers for large city projects funded with state and federal dollars.
| Dec 13, 2011
LEED-EB outpaces LEED for new construction
The U.S. Green Building Council's (USGBC's) LEED certifications for existing buildings standard is outpacing LEED for new buildings for the first time.
| Dec 13, 2011
Regulators charge pervasive abuse of construction workers in Connecticut
Federal and state regulators say they have uncovered what they call "widespread noncompliance" with minimum wage and overtime laws in Connecticut's construction industry.
| Dec 13, 2011
Philadelphia mayor signs order for project labor agreements
Philadelphia Mayor Michael Nutter signed an executive order establishing project labor agreements for major public works projects in Philadelphia.
| Dec 13, 2011
Improved code requirements for attic ventilation
The Roof Assembly Ventilation Coalition (RAVC) participated in the development of the code.
| Dec 12, 2011
LEED-EB Outpaces LEED for New Construction
The U.S. Green Building Council’s (USGBC’s) LEED certifications for existing buildings standard is outpacing LEED for new buildings for the first time.